Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Approved
Review Details: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1
Plan Number - CIP-0424-00014
Review Name: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TW Planning and Engineering Review | APPROVED | ||||
Entitlements | NOT REQUIRED | ||||
New Services/JOC | NOT REQUIRED | CIP-0424-00014 - CIP - Dev Site + Comm Structure - Initial v1 - 2550 W SWEETWATER DR - PRJ000431 Reclaimed Water Treatment Plant Demonstration Facility - Filter demolition within a building Tucson Water’s New Development Section has no comments on this CIP Project or this submittal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
|||
NPPO | NOT REQUIRED | ||||
Real Estate | NOT REQUIRED | ||||
ROW Engineering Review | NOT REQUIRED | ||||
Signs | NOT REQUIRED | Demolition of water filter system - no new signage shown on any site diagrams. Email me at Heather.Thrall@tucsonaz.gov if you have questions on proposing any new signs. | |||
Site Landscape | NOT REQUIRED | ||||
Storm to Shade Review | NOT REQUIRED | ||||
Zoning Administration | NOT REQUIRED | ||||
Zoning Compliance Review | NOT REQUIRED | ||||
Zoning Modifications - DDO | NOT REQUIRED | ||||
Zoning Modifications - IPP | NOT REQUIRED | ||||
Zoning Modifications - MS&R | NOT REQUIRED | ||||
Zoning Modifications - Variance | NOT REQUIRED | ||||
Building Official | REVIEW COMPLETED | ||||
CDRC Post Review | REVIEW COMPLETED | ||||
Commercial Building | REVIEW COMPLETED | ||||
Commercial Electrical | REVIEW COMPLETED | Please address the electrical plan review comments and provide a written response. 1 Provide valid electrical Engineers Seals on the plans. 2 Electrical plan sheets 3 of 4 and 4 of 4 and beyond are blank. Please provide complete plans. Rf; 2018 IBC section 107.2.1, 2017 NEC. |
|||
Commercial Mechanical | REVIEW COMPLETED | ||||
Commercial Plumbing | REVIEW COMPLETED | ||||
Fire New Construction | REVIEW COMPLETED | ||||
Historic | REVIEW COMPLETED | Property is located within the Archaeology Sensitivity Zone and also within known sites [AZ AA:12:91(ASM) and AZ AA:12:1139(ASM)]. Based on the description of work, it appears that work will be limited to removing internal pipes, electrical, etc. If there is any grading, trenching, digging or boring, an archaeological monitor will need to be present during the work. Clarify on the plans any intent for grading, trenching, digging or boring. Questions? Jodie.Brown@tucsonaz.gov | |||
Site Engineering | REVIEW COMPLETED | ||||
Site Zoning | REVIEW COMPLETED | Zoning has no comments based on the submitted plans. A separate demolition permit will be required once the CIP review process is complete and approved. If you have questions about the above comments reach out to Nathan Herrera at Nathan.Herrera@tucsonaz.gov |
|||
Traffic Engineering Review | REVIEW COMPLETED | No comments. Nothing in plan in purview of DTM Traffic Engineering Division. | |||
TSMR/PDMR - Engineering | REVIEW COMPLETED | ||||
Water - PDSD | REVIEW COMPLETED |