Plan Review Detail
Review Status: Approved
Review Details: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Plan Number - CIP-0424-00014
Review Name: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Site Zoning | APPROVED | Zoning has no comments based on the submitted plans. A separate demolition permit will be required once the CIP review process is complete and approved. If you have questions about the above comments reach out to Nathan Herrera at Nathan.Herrera@tucsonaz.gov | |||
Building Official | REVIEW COMPLETED | ||||
CDRC Application Completeness | REVIEW COMPLETED | TEP external reviewer may be required based on scope of work, see internal note for more details. No other external reviewers required at this time. SB. | |||
CDRC Post Review | REVIEW COMPLETED | ||||
Commercial Building | REVIEW COMPLETED | Provide egress lighting plan and demonstrate lighting meets the following. IBC 1008. 1. Provide illumination for the means of egress, including the exit discharge A. The means of egress illumination level shall not be less than 1 foot-candle at the walking surface. C. The means of egress illumination shall be supplied by backup power (consisting of storage batteries, unit equipment, or an on-site generator) for a duration of not less than 90 minutes. IBC 1008.3 |
|||
Commercial Electrical | REVIEW COMPLETED | See Commercial Building comments pertaining to egress lighting. Revise electrical lighting plan as necessary and resubmit. Ref: 2018 IBC section 107.2.1, 2017 NEC. |
|||
Commercial Mechanical | REVIEW COMPLETED | ||||
Commercial Plumbing | REVIEW COMPLETED | ||||
PDSD Application Completeness | REVIEW COMPLETED | ||||
Site Engineering | REVIEW COMPLETED | ||||
Traffic Engineering Review | REVIEW COMPLETED | No comments. Not related to Traffic. This project should not require a Traffic Engineering review. | |||
TW Planning and Engineering Review | REVIEW COMPLETED | ||||
Water - PDSD | REVIEW COMPLETED |