Plan Review Detail
Review Status: In Review
Review Details: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Plan Number - CIP-0325-00004
Review Name: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Traffic Engineering Review | APPROVED | Traffic Engineering has no comments on this project. | |||
| TSMR/PDMR - Engineering | NOT REQUIRED | ||||
| TSMR/PDMR - Environmental Services | NOT REQUIRED | ||||
| Zoning Administration | NOT REQUIRED | ||||
| Zoning Compliance Review | NOT REQUIRED | ||||
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| Neighborhood Traffic Mitigation | PENDING ASSIGNMENT | ||||
| External Reviewers - Tucson Electric Power (TEP) | REQUIRES RESUBMIT | May 5, 2026 WO#T181683 City of Tucson Planning and Development Services Attn: CDRC Admi Team Dear CDRC Admi Team Subject: PARK IMPROVEMENTS INCLUDING SPLASH PAD, RESTROOMS, AND PLAYGROUND EQUIPMENT. CIP-0325-00004 Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 4/10/2026. There are existing facilities within the development which are depicted upon the plan. COMMENTS ONLY PLEASE INDICATE APPROVAL WITH THE BELOW CHECK BOX PLEASE DO NOT ADJUST IF THERE ARE NO COMMENTS Further: TEP Easement Bk 7974 Pg 1037 not shown on development plan. TEP Easement Bk 2636 Pg 303 shown but not labeled with book/page. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. Questions regarding Land, ROW, Easement, etc., please contact the TEP Land Department Liz Boehler Right of Way Agent 520-686-1341 Landreviews@tep.com Should you have any technical questions, please contact the area designer, Chuck Leon (520) 400-6133 cleon@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
|||
| Archeological Sensitivity - Standard | REVIEW COMPLETED | The project is located within an Archaeological Sensitivity Zone. Archaeological monitoring will be required for the installation of the waterline that mostly parallels the park entrance road. A geoarchaeological study is currently being drafted by an archaeological consultant. The results of this report will inform whether archaeological monitoring is required for other portions of the project. | |||
| Bldg Permits - Post Review Express | REVIEW COMPLETED | ||||
| Building Official | REVIEW COMPLETED | ||||
| CDRC Application Completeness Express | REVIEW COMPLETED | CDRC added Parks, ADOT, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Parks, ADOT, and TEP. FYI email sent to PAG, USPS, SWG. If any of the following apply, a Fugitive Dust Activity Permit is required from the Pima County Department of Environmental Quality (PDEQ). Earthmoving or Land Clearing over 1 acre Trenching over 300 feet for utility installation or repair Road construction over 50 feet Blasting Please contact the following to obtain your permit. Fugitive Dust Activity Permit: Contact Pima County ADEQ at (520) 724-7400 https://www.pima.gov/596/Fugitive-Dust Once received you may upload your permit to the attachment section along with any external reviewer approval letters. If you have any questions regarding this information, please contact Sonya Bermudez at sonya.bermudez@tucsonaz.gov or 520-730-7979. |
|||
| Commercial Building | REVIEW COMPLETED | ||||
| Commercial Electrical | REVIEW COMPLETED | Commercial Electrical Review CIP-0325-00004 (4300 N SILVERBELL RD TUCSON, AZ 85745) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Reference sheet E-1.1, Existing Restroom electrical panel. The provided space does not appear to have the required clear working space as required by NEC 110.26(A). provide measurements showing working space is available or relocate this panel to a code compliant location. |
|||
| Commercial Mechanical | REVIEW COMPLETED | ||||
| Commercial Plumbing | REVIEW COMPLETED | ||||
| Entitlements | REVIEW COMPLETED | ||||
| External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | CDRC ADOT has no comments. Thanks, Rick Freije |
|||
| External Reviewers - COT Parks & Recreation | REVIEW COMPLETED | CDRC Donald Russell Regarding CIP-0325-00004, The City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required. Description: Danny Lopez Park Parcel: 10304001X Regards, Joe Barr Project Manager Tucson Parks and Recreation 520-307-2811 |
|||
| External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | |||
| External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | |||
| External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | |||
| Fire New Construction | REVIEW COMPLETED | ||||
| Historic | REVIEW COMPLETED | The project is located within an Archaeological Sensitivity Zone. Archaeological monitoring will be required for the installation of the waterline that mostly parallels the park entrance road. A geoarchaeological study is currently being drafted by an archaeological consultant. The results of this report will inform whether archaeological monitoring is required for other portions of the project. |
|||
| NPPO | REVIEW COMPLETED | ||||
| Outdoor Lighting | REVIEW COMPLETED | No comments. | |||
| PDSD Application Completeness Express | REVIEW COMPLETED | ||||
| ROW Engineering Review | REVIEW COMPLETED | ||||
| Signs | REVIEW COMPLETED | ||||
| Site Engineering | REVIEW COMPLETED | ||||
| Site Landscape | REVIEW COMPLETED | PDSD SITE LANDSCAPE REVIEW: 1. The color used to depict the irrigation layout and equipment is appreciated for review. Run some test plots in black and white and photocopy to make sure the plans are still legible for contractor installation. Thank you. Chad Keller, PLA chad.keller@tucsonaz.gov |
|||
| Site Zoning | REVIEW COMPLETED | ||||
| TSMR/PDMR - Landscape | REVIEW COMPLETED | ||||
| TSMR/PDMR - Zoning | REVIEW COMPLETED | ||||
| TW Planning and Engineering Review | REVIEW COMPLETED | Review complete no comments | |||
| Water - PDSD | REVIEW COMPLETED |