Plan Review Detail
Review Status: Approved
Review Details: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Plan Number - CIP-0324-00008
Review Name: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Traffic Engineering Review | NOT REQUIRED | This site is not located in COT limits. DTM Traffic Engineering Division therefore has no feedback. | |||
| Zoning Administration | NOT REQUIRED | ||||
| Bldg Permits - Post Review Express | REVIEW COMPLETED | ||||
| Building Official | REVIEW COMPLETED | ||||
| CDRC Application Completeness Express | REVIEW COMPLETED | TEP request for review has been sent and TEP external reviewer account has been added to project for file review. | |||
| CDRC Post Review Express | REVIEW COMPLETED | Please submit all documentation supporting external review approvals, required permits, and reports to your DP application using your TDC online applicant account. | |||
| Commercial Building | REVIEW COMPLETED | ||||
| Commercial Electrical | REVIEW COMPLETED | No comments | |||
| Commercial Mechanical | REVIEW COMPLETED | ||||
| Commercial Plumbing | REVIEW COMPLETED | ||||
| Entitlements | REVIEW COMPLETED | No objection | |||
| External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Good Afternoon, Tucson Electric Power (TEP) has reviewed and has no objection to the preliminary plans provided. Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument. It is owner responsibility to obtain the written consent of the landowner and any other parties with an interest in or jurisdiction over the proposed use of the property. Please reach out with any questions. Thank you, Sabrina Kyles Right of Way Agent Tucson Electric Power 520-891-2004 |
|||
| Fire New Construction | REVIEW COMPLETED | no comments from TFD | |||
| Historic | REVIEW COMPLETED | AD Waiver previously provided. Questions? Jodie.Brown@tucsonaz.gov | |||
| New Services/JOC | REVIEW COMPLETED | CIP-0324-00008 - CIP - Dev Site + Comm Structure – Final v1 – 3700 W Pecos WY Tucson Water’s New Development Section has the following comments regarding the proposed construction plan: 1. Sheet 1, Location Map: The configuration of many of the parcels shown in the NW Quarter of Section 17 still does not match that shown on GeoWorx or PimaMaps. Please revise the configuration of all the parcels in the NW Quarter of Section 17 as shown in the screen capture from Pima maps (log_OASIS-C-128A_COT_comment_response_PDSD_No.3_v1.pdf) – 2nd request. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
|||
| NPPO | REVIEW COMPLETED | Site Landscape/NPPO Section has no additional comments. Chad Keller, RLA chad.keller@tucsonaz.gov |
|||
| PDSD Application Completeness Express | REVIEW COMPLETED | ||||
| Site Engineering | REVIEW COMPLETED | Site Engineering has no comments | |||
| Site Landscape | REVIEW COMPLETED | Site Landscape/NPPO Section has no additional comments. Chad Keller, RLA chad.keller@tucsonaz.gov |
|||
| Water - PDSD | REVIEW COMPLETED |