Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: _B520CBE076508
Plan Details
Apply Date:
09/01/2015
Applicant:
N/A
Description:
7200 E TANQUE VERDE RD
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/27/2012 | COT - FOPR - Tent/Structure | Completed | Tent permit # T12BU00883. Tent inspection request for Friday @ 0900hrs. See email for details. | |
06/18/2019 | COT - Fire - Complaint | Completed | IROL 05.30.19 Climatec Riser |
|
01/12/2022 | COT - FCOD - Fire Operational Permit | Completed | JH Living Hope Family Church T220OOOOO1 live outdoor music event |
|
01/11/2022 | COT - FOPR - Fire Special Event | Completed | SERC 12.21.21 THE LIVING YOUR HOPE LIVE CONCERT IN THE PARK | |
03/03/2022 | COT - Fire - City Facility | Completed | 03/03/2022 JLC Fire and Life Safety inspection conducted of Udall Senior Center with Rachel Fearon of Safety Group. |
|
04/29/2022 | COT - FCOD - Fire Re-inspection | Completed | Udall Pool 05.11.22 ML - Master key to pool placed in key box. 05/25/22 JLC Closed per report from Rachel Fearon showing all violations abated. |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/27/2012 | COT - FOPR - Tent/Structure | Completed | Tent permit # T12BU00883. Tent inspection request for Friday @ 0900hrs. See email for details. | |
06/18/2019 | COT - Fire - Complaint | Completed | IROL 05.30.19 Climatec Riser |
|
01/12/2022 | COT - FCOD - Fire Operational Permit | Completed | JH Living Hope Family Church T220OOOOO1 live outdoor music event |
|
01/11/2022 | COT - FOPR - Fire Special Event | Completed | SERC 12.21.21 THE LIVING YOUR HOPE LIVE CONCERT IN THE PARK | |
03/03/2022 | COT - Fire - City Facility | Completed | 03/03/2022 JLC Fire and Life Safety inspection conducted of Udall Senior Center with Rachel Fearon of Safety Group. |
|
04/29/2022 | COT - FCOD - Fire Re-inspection | Completed | Udall Pool 05.11.22 ML - Master key to pool placed in key box. 05/25/22 JLC Closed per report from Rachel Fearon showing all violations abated. |