Plan: _AA06B5A28613C
Plan Details
Apply Date:
09/29/2017
Applicant:
N/A
Description:
2151 N PALO VERDE BL
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2016 | COT - FOPR - Fire General Inspection | Completed | C of O inspection 8/12/16 | |
| 04/27/2022 | Inspections of I-1 and I-2 occupancies, as well as day cares (child and adult) | Completed | ||
| 04/27/2022 | COT - Fire - Complaint | Completed | ||
| 06/14/2023 | COT - FCOD - Fire Re-inspection | Completed | 11/16/22 TDP - During my visit I confirmed that a classroom located on a second floor is not being used at this time. I also met with architect and school representatives. We discussed number of potential solutions to the classroom on the second floor. I stressed importance of them not doing any renovation without prior approval from Fire Department as well as Building Dep. I also asked Mr. Barns to send me an e-mail every 2 weeks to a 1 month on a progress of fire alarm system as well as 2nd floor classroom. Next meeting is schedule for 01/17/23 1/27/23 - spoke with Dan from Corner Stone Technologies (520-465-8499) was told that he is still working with supplier to obtain appropriate parts. Should have plans drown and submitted by end of February. 2/28/23 - Left voice message for Don asking for a fire alarm update. Will follow up in a week. 5/11/23 -Conducted a meeting between myself and school management. Explained that an action plan needs to be set up to ensure successful completion of the fire alarm system installation. Will follow up on 5/31/23. 06/13/23 TDP - with the exception of the new fire alarm system, all items are completed at this time. A new entry will be created to follow up on fire alarm installation progress. |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2016 | COT - FOPR - Fire General Inspection | Completed | C of O inspection 8/12/16 | |
| 04/27/2022 | Inspections of I-1 and I-2 occupancies, as well as day cares (child and adult) | Completed | ||
| 04/27/2022 | COT - Fire - Complaint | Completed | ||
| 06/14/2023 | COT - FCOD - Fire Re-inspection | Completed | 11/16/22 TDP - During my visit I confirmed that a classroom located on a second floor is not being used at this time. I also met with architect and school representatives. We discussed number of potential solutions to the classroom on the second floor. I stressed importance of them not doing any renovation without prior approval from Fire Department as well as Building Dep. I also asked Mr. Barns to send me an e-mail every 2 weeks to a 1 month on a progress of fire alarm system as well as 2nd floor classroom. Next meeting is schedule for 01/17/23 1/27/23 - spoke with Dan from Corner Stone Technologies (520-465-8499) was told that he is still working with supplier to obtain appropriate parts. Should have plans drown and submitted by end of February. 2/28/23 - Left voice message for Don asking for a fire alarm update. Will follow up in a week. 5/11/23 -Conducted a meeting between myself and school management. Explained that an action plan needs to be set up to ensure successful completion of the fire alarm system installation. Will follow up on 5/31/23. 06/13/23 TDP - with the exception of the new fire alarm system, all items are completed at this time. A new entry will be created to follow up on fire alarm installation progress. |