Plan: _28BF4FCA4DE3E
Plan Details
Apply Date:
09/01/2015
Applicant:
N/A
Description:
400 S SARNOFF DR
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2022 | COT - Fire - City Facility | Completed | 02/24/2022 JLC Fire and life safety inspection conducted by M Lewis with Rachel Fearon of Safety Group. |
|
| 03/23/2022 | COT - FCOD - Fire Re-inspection | Completed | Jessie Owens Park Maint. Compound 03/23/2022 JLC Closed per report received from Rachel Fearon showing all violations abated. |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2022 | COT - Fire - City Facility | Completed | 02/24/2022 JLC Fire and life safety inspection conducted by M Lewis with Rachel Fearon of Safety Group. |
|
| 03/23/2022 | COT - FCOD - Fire Re-inspection | Completed | Jessie Owens Park Maint. Compound 03/23/2022 JLC Closed per report received from Rachel Fearon showing all violations abated. |