Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: TW-WCP-0524-00039
Plan Details
Apply Date:
N/A
Applicant:
David
Description:
N/A
Architects:
- Concord General Contracting, Inc.
- Grenier Engineering
- Light + Path Architecture LLC
- Teen Challenge
Contractors:
Plan Reviews
Plan Number - TW-WCP-0524-00039
Plan Status:
Plan Description:
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/13/2024 | Water Design Plan Review v.2 | REQUIRES RESUBMIT | |
10/24/2024 | Water Design Plan Review v.5 | APPROVED | |
08/23/2024 | Water Design Plan Review v.3 | REQUIRES RESUBMIT | |
05/31/2024 | Water Design Plan Review v.1 | REQUIRES RESUBMIT | |
10/14/2024 | Water Design Plan Review v.4 | REQUIRES RESUBMIT |