Plan Details
Status:
Review complete
Type:
TW CIP Planning & Engineering
Apply Date:
03/31/2026
Applicant:
Al
Description:
The Freeway Large Meter assembly has been upgraded, PRV is working, exterior wall has been constructed, and gate has been installed.
*As-builts are being created by CEC *NTP for as-builts was sent 5/26/2026.
Survey conducted by CEC on 6/4