Plan: TW-PLAN-0326-0055
Plan Details
Apply Date:
01/01/2026
Applicant:
shi
Description:
Installing approximately 1400ft of 6" water pipeline on Woodland Ave and Bellevue St, and 400ft of 4" water pipeline within the alley West of Woodland Ave. Abandon 700ft of existing water main and relocate services to front of lot.
Architects:
- Innova Engineering LLC
Contractors:
Plan Reviews
Plan Number - TW-PLAN-0326-0055
Plan Status: Approved to Construct
Plan Description: Installing approximately 1400ft of 6" water pipeline on Woodland Ave and Bellevue St, and 400ft of 4" water pipeline within the alley West of Woodland Ave. Abandon 700ft of existing water main and relocate services to front of lot.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2026 | TWPE Plan Revision v.1 | APPROVED | |
| 06/03/2026 | TWPE Plan Revision v.1 | APPROVED | |
| 04/23/2026 | TWPE Plan Revision v.1 | APPROVED |