Plan: TR-FTTP-1126-00056
Plan Details
Apply Date:
11/25/2026
Applicant:
Darin
Description:
Ideatek Project ID Plans: #26-0608 Tucson - Zone 231 #26-0609 Tucson - Zone 232 Total Estimated Linear Feet (Excavation/Bore): 35,308 feet Serviceable Locations - 966 Excavation for conduit installation with directional boring. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Quantities & Location Details Number of Vaults/Handholes: Service Pedestal - 180 10” Flower Pot - 20 15" x 24" - 17 24" x 36" - 25 36" x 48" - 1 36"x 60" - 0 Project Location/Limits: Scope of work is S Avenida Del Sol west to S Wilmot Rd and between E Golf Link Rd north to E Calle Castor. This plan consists of 8 permit sections = 8 ROW Fiber permits will be applied for upon approval of this plan. Method of work changes in the field may require a REVISION submittal or upload as builds after completion. PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
Architects:
- Ideatek
- Ideatek Telcom LLC
Contractors:
Plan Reviews
Plan Number - TR-FTTP-1126-00056
Plan Status: In Review
Plan Description: Ideatek Project ID Plans:
#26-0608 Tucson - Zone 231
#26-0609 Tucson - Zone 232
Total Estimated Linear Feet (Excavation/Bore): 35,308 feet
Serviceable Locations - 966
Excavation for conduit installation with directional boring. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03
Quantities & Location Details
Number of Vaults/Handholes:
Service Pedestal - 180
10” Flower Pot - 20
15" x 24" - 17
24" x 36" - 25
36" x 48" - 1
36"x 60" - 0
Project Location/Limits: Scope of work is S Avenida Del Sol west to S Wilmot Rd and between E Golf Link Rd north to E Calle Castor.
This plan consists of 8 permit sections = 8 ROW Fiber permits will be applied for upon approval of this plan.
Method of work changes in the field may require a REVISION submittal or upload as builds after completion.
PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/25/2026 | Right of Way Review v.1 | IN REVIEW |