Plan Details

Status:
In review
Type:
Fiber Plan Review
Apply Date:
11/24/2026
Applicant:
Holly
Description:
Ideatek Project ID Plans: #26-0871 Tucson - Zone 203 Total Estimated Linear Feet (Excavation/Bore): 18,70 feet Serviceable Locations - 338 Excavation for conduit installation with directional boring. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Quantities & Location Details Number of Vaults/Handholes: Service Pedestal - 47 10” Flower Pot - 21  15" x 24" - 41 24" x 36" - 17 36" x 48" - 0 36"x 60" - 0 Project Location/Limits: Scope of work is S Kolb Rd west to E Elson Ave and between E Escalante Rd north to E Stella Rd. This plan consists of 3 permit sections = 3 ROW Fiber permits will be applied for upon approval of this plan. Method of work changes in the field may require a REVISION submittal or upload as builds after completion. PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
Architects:
  • Ideatek
  • Ideatek Telcom LLC
Contractors:

Plan Reviews

Plan Number - TR-FTTP-1126-00054
Plan Status: In Review
Plan Description: Ideatek Project ID Plans: #26-0871 Tucson - Zone 203 Total Estimated Linear Feet (Excavation/Bore): 18,70 feet Serviceable Locations - 338 Excavation for conduit installation with directional boring. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Quantities & Location Details Number of Vaults/Handholes: Service Pedestal - 47 10” Flower Pot - 21  15" x 24" - 41 24" x 36" - 17 36" x 48" - 0 36"x 60" - 0 Project Location/Limits: Scope of work is S Kolb Rd west to E Elson Ave and between E Escalante Rd north to E Stella Rd. This plan consists of 3 permit sections = 3 ROW Fiber permits will be applied for upon approval of this plan. Method of work changes in the field may require a REVISION submittal or upload as builds after completion. PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
Start Date Submittal Complete Date Status  
11/24/2026 Right of Way Review v.1 IN REVIEW Review Details