Plan: TR-FTTP-1026-00023
Plan Details
Apply Date:
10/28/2026
Applicant:
Laura
Description:
Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
Architects:
- Wyyerd Fiber
- Wyyerd Fiber LLC
Contractors:
Outstanding Plan Activity Conditions
Plan Number - TR-FTTP-1026-00023
Plan Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
| Date | Name | Approved | Comments |
|---|---|---|---|
| 11/06/2026 | Not Approved | 1. sidewalk 2. traffic control- 9-3:30 except in areas where utilitizing existing traffic control set up on Grant rd 3. Landscape 4. Coordinate with PM Rob Lane 5. HOliday restrictions |
Plan Reviews
Plan Number - TR-FTTP-1026-00023
Plan Status: Approved
Plan Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/28/2026 | Right of Way Review v.1 | APPROVED |