Plan Details

Status:
Approved
Type:
Fiber Plan Review
Apply Date:
10/28/2026
Applicant:
Laura
Description:
Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run.  The conduit is located within the Centurylink manhole system.  Our contractor will lift the manhole lid to access the manhole and perform the required work.  The contractor will be at each manhole for 30 minutes to an hour.  Each run takes approximately 2-3 days.
Architects:
  • Wyyerd Fiber
  • Wyyerd Fiber LLC
Contractors:

Outstanding Plan Activity Conditions

Plan Number - TR-FTTP-1026-00023
Plan Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run.  The conduit is located within the Centurylink manhole system.  Our contractor will lift the manhole lid to access the manhole and perform the required work.  The contractor will be at each manhole for 30 minutes to an hour.  Each run takes approximately 2-3 days.
Date Name Approved Comments
11/06/2026 Not Approved 1. sidewalk 2. traffic control- 9-3:30 except in areas where utilitizing existing traffic control set up on Grant rd 3. Landscape 4. Coordinate with PM Rob Lane 5. HOliday restrictions

Plan Reviews

Plan Number - TR-FTTP-1026-00023
Plan Status: Approved
Plan Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run.  The conduit is located within the Centurylink manhole system.  Our contractor will lift the manhole lid to access the manhole and perform the required work.  The contractor will be at each manhole for 30 minutes to an hour.  Each run takes approximately 2-3 days.
Start Date Submittal Complete Date Status  
10/28/2026 Right of Way Review v.1 APPROVED Review Details

Documents

File Name Document Type  
DESIGN PLAN-PROOFING SITE MAPS 02_TUCSON_10.27.26-A1_V1.PDF DOCUMENTS VIEW
PROOFING TCP PLANS 02_TUCSON_10.27.26_V1.PDF DOCUMENTS VIEW