Plan Details

Status:
Approved
Type:
Fiber Plan Review
Apply Date:
10/28/2026
Applicant:
Max
Description:
For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. 1. Swan rd- Valencia rd south to Fairy Duster dr 2. San Juan trl- Greasewood east to Mission rd 3. Grant rd- Bryant ave west to Mountain ave
Architects:
  • Wyyerd Fiber
  • Wyyerd Fiber LLC
Contractors:

Outstanding Plan Activity Conditions

Plan Number - TR-FTTP-1026-00021
Plan Description: For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. 1. Swan rd- Valencia rd south to Fairy Duster dr 2. San Juan trl- Greasewood east to Mission rd 3. Grant rd- Bryant ave west to Mountain ave
Date Name Approved Comments
10/29/2026 San Juan Trail (greasewood to mission) Not Approved 1. Loss of use fees apply to traffic control that is up for more than 3 days. 2. Sidewalk
10/29/2026 Swan from Valencia to Fairy Duster Not Approved 1. LoU fees apply to TC up more than 3 days

Plan Reviews

Plan Number - TR-FTTP-1026-00021
Plan Status: Approved
Plan Description: For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. 1. Swan rd- Valencia rd south to Fairy Duster dr 2. San Juan trl- Greasewood east to Mission rd 3. Grant rd- Bryant ave west to Mountain ave
Start Date Submittal Complete Date Status  
10/28/2026 Right of Way Review v.1 APPROVED Review Details

Documents

File Name Document Type  
DESIGN PLAN-PROOFING SITE MAPS 01_TUCSON_10.27.26-A1_V1.PDF DOCUMENTS VIEW
PROOFING TCP PLANS 01_TUCSON_10.27.26_V1.PDF DOCUMENTS VIEW