Plan: TR-FTTP-0926-00011
Plan Details
Apply Date:
09/09/2026
Applicant:
Caleb
Description:
Wyyerd- Proof CenturyLink existing conduit by blowing air through it to test for blockage etc. Men and equipment only. Work will be completed M-F 9AM to 3:30PM. Proofing Only, no construction. Will be at each manhole approx 15 minutes and will move to the next manhole. 3 locations: 1. South side of San Juan Trail from Greaswood to S San Jacinto Dr (east of La Cholla blvd) 2. North side of Valencia rd. from Park ave to Country Club rd 3. On south west corner of Prince rd and Stone ave **No new construction will be performed
Architects:
- Wyyerd Fiber
- Wyyerd Fiber LLC
Contractors:
Outstanding Plan Activity Conditions
Plan Number - TR-FTTP-0926-00011
Plan Description: Wyyerd- Proof CenturyLink existing conduit by blowing air through it to test for blockage etc. Men and equipment only. Work will be completed M-F 9AM to 3:30PM. Proofing Only, no construction. Will be at each manhole approx 15 minutes and will move to the next manhole.
3 locations:
1. South side of San Juan Trail from Greaswood to S San Jacinto Dr (east of La Cholla blvd)
2. North side of Valencia rd. from Park ave to Country Club rd
3. On south west corner of Prince rd and Stone ave
**No new construction will be performed
| Date | Name | Approved | Comments |
|---|---|---|---|
| 10/08/2026 | Prince & Stone | Not Approved | 1. Bus stop 2. Sidewalk/ Ped |
| 10/08/2026 | San Juan Trail | Not Approved | Work planned/ coming up- 1. RTA NExt #28: S La Cholla blvd moderniazation project (Modernize existing roadway including bicycle, pedestrian and associated intersection and drainage improvements). 2. 411 pre-design Phase 2: Hiram Banks Acres (Forrest ave, Helton, San Juaquin) street maintanence 3. 411 pre-design Phase 2: Hiram Banks Acres / A Mountain Addition Moratorium: San Juan Trl is under pavement moratorium |
| 10/08/2026 | Valencia | Not Approved | 1. RTA #23 IN DESIGN: I19 to Alvernon (Access management improvements, safety improvements, and intersection improvements) pm Kyle.DeWitte@tucsonaz.gov 2. AIRPORT WASH- if any crossing of this wash via boring a floodplain use permit will be needed. 3. Bus stop/ route on Valencia 4. sidewalks/ ped |
Plan Reviews
Plan Number - TR-FTTP-0926-00011
Plan Status: Approved
Plan Description: Wyyerd- Proof CenturyLink existing conduit by blowing air through it to test for blockage etc. Men and equipment only. Work will be completed M-F 9AM to 3:30PM. Proofing Only, no construction. Will be at each manhole approx 15 minutes and will move to the next manhole.
3 locations:
1. South side of San Juan Trail from Greaswood to S San Jacinto Dr (east of La Cholla blvd)
2. North side of Valencia rd. from Park ave to Country Club rd
3. On south west corner of Prince rd and Stone ave
**No new construction will be performed
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/07/2026 | Right of Way Review v.3 | APPROVED | |
| 09/30/2026 | Right of Way Review v.2 | REQUIRES RESUBMIT | |
| 09/10/2026 | Right of Way Review v.1 | REQUIRES RESUBMIT |