Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
Fees paid
Type:
Pre-Application
Address:
1725 E BILBY RD

Apply Date:
11/13/2026
Applicant:
Marco
Description:
RESTRICTED RECORDS / After more than 70 years of continuous operation, Sunnyside High School is preparing to undertake the first significant multi-phase campus replacement in its history. This partial campus replacement will replace a large portion of some of the oldest buildings on the campus which are nearing the end of or are beyond the term of their useful life. This campus replacement will change the public face of the campus as most of the buildings that are currently visible from the street will be replaced as part of this project. Due to the existing geometric site constraints and boundaries created by other existing buildings, active sport fields, as well as necessary drive aisles and pedestrian walkways which will need to stay active throughout the span of construction, this project will have to address the replacement of existing academic components through new vertical expansions to the campus. After a series of assessments and site studies, the design team, with the input and guidance of the local community, has begun coalescing around a proposed design solution that will create enough flexibility within the campus to begin unfolding the complex geometric puzzle of academic spaces within the campus. This project will necessarily need to occur in a series of 3 phases. Each phase will include a demolition and new build phase. The first phase will entail the demolition of a few select existing academic and administrative buildings on campus as well as construction of a new multi-story academic building. The second phase will again entail the demolition of additional existing academic buildings as well as construction of new multi-story academic buildings. The final phase will wrap up the scope of this project with the demolition of the final group of existing academic buildings as well as significant site work to create a more ample on-campus parking area and queueing lane for student drop off as well as a new unified campus landscape layout. These proposed changes holistically address the current and future needs of the Sunnyside High School campus, preparing the campus for the next 70 years of multi-generational community-building. At the same time, these proposed changes honor the history and culture of the community that has made Sunnyside such a rich and vibrant cornerstone of this school district.
Architects:
  • Grace Design Studios
Contractors: