Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Complete
Type:
Pre-Application
Apply Date:
10/02/2025
Applicant:
Dorine
Description:
REDAR is developing a new aerospace-grade manufacturing facility. The new manufacturing facility will support REDAR’s rubber mixing and finishing operations and is located at 3749 N. Romero Rd, Tucson, AZ. This project involves the ground-up design and construction of a ~33,000 square foot facility, anticipated to be a pre-engineered metal building (PEMB).
Architects:
  • Adam.Edwards
  • M3 Engineering
  • M3 Engineering & Technology
  • M3 Engineering & Technology Corp.
  • REBECCA.MARTINEZ
Contractors:

Plan Reviews

Plan Number - TP-PRE-1025-00201
Plan Status: Complete
Plan Description: REDAR is developing a new aerospace-grade manufacturing facility. The new manufacturing facility will support REDAR’s rubber mixing and finishing operations and is located at 3749 N. Romero Rd, Tucson, AZ. This project involves the ground-up design and construction of a ~33,000 square foot facility, anticipated to be a pre-engineered metal building (PEMB).
Start Date Submittal Complete Date Status  
10/13/2025 Pre-Application Conference Review v.1 APPROVED Review Details

Documents

File Name Document Type  
CI001_V1.PDF DOCUMENTS VIEW