Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
Fees paid
Type:
Pre-Application
Apply Date:
02/06/2026
Applicant:
Jenna
Description:
Tucson Electric Power Company (TEP) requests a Special Exception Land Use permit (SELUP) for the Hedrick Substation. The project is located on TEP fee owned parcel, 112-05-0460 within the R-1 residential zone. Total area of the site is approximately .88 acres. The current TEP Hedrick substation takes up approximately .45 acres of the southern portion of the property. This proposal would expand the substation onto the northern half of the property. TEP is proposing a phased project consisting of converting the current 4 kV distribution system to 13.8 kV and installing three new 46kV-13.8kV/4.16kV dual voltage pad-mounted transformers.
Architects:
  • Tucson Electric Power
Contractors:

Plan Reviews

Plan Number - TP-PRE-0226-00035
Plan Status: Fees Paid
Plan Description: Tucson Electric Power Company (TEP) requests a Special Exception Land Use permit (SELUP) for the Hedrick Substation. The project is located on TEP fee owned parcel, 112-05-0460 within the R-1 residential zone. Total area of the site is approximately .88 acres. The current TEP Hedrick substation takes up approximately .45 acres of the southern portion of the property. This proposal would expand the substation onto the northern half of the property. TEP is proposing a phased project consisting of converting the current 4 kV distribution system to 13.8 kV and installing three new 46kV-13.8kV/4.16kV dual voltage pad-mounted transformers.
Start Date Submittal Complete Date Status  
02/09/2026 Pre-Application Conference Entitlements Review v.1 APPROVED Review Details