Plan Details
Status:
Void
Type:
Pre-Application
Apply Date:
01/04/2024
Applicant:
Max
Description:
*VOID* MEETING NOT NEEDED AT THIS TIME / Tucson Water is expanding the Southeast Houghton Area Recharge Project (SHARP) reclaimed water recharge facility. The project is currently in the design phase.
The expansion and eventual construction of a 4th recalimed water basin will take place within the SHARP facility property. Construction expected in late 2024 or early 2025.