Plan Details

Status:
In review
Type:
Basin
Apply Date:
08/25/2023
Applicant:
David
Description:
Southern side of site, basin 3.0
Architects:
  • DUSTY
  • Forestar
  • Forestar (USA) Real Estate Group Inc.
  • Linda Thompson / The WLB Group, inc.
  • WLB Group
Contractors:

Scheduled Inspections

Plan Number - TE-BAS-0823-00144
Plan Status: In Review
Plan Description: Southern side of site, basin 3.0
Total Scheduled Inspections - 1
Scheduled Date Description Inspector Status
09/09/2026 COT - BASN - Drainage/Basin - Annual Inspection - Recur Scheduled

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/27/2023 COT - BASN - Drainage/Basin - Condition Inspection Partial Pass The section of 4 drain pipes can be backfilled, the one single long pipe needs to be pitched in the right direction from basin to desert floor.

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/08/2023 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Good