Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: TE-BAS-0823-00144
Plan Details
Apply Date:
08/25/2023
Applicant:
David
Description:
Southern side of site, basin 3.0
Architects:
- DUSTY
- Forestar
- Forestar (USA) Real Estate Group Inc.
- Linda Thompson / The WLB Group, inc.
- WLB Group
Contractors:
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2023 | COT - BASN - Drainage/Basin - Condition Inspection | Partial Pass | The section of 4 drain pipes can be backfilled, the one single long pipe needs to be pitched in the right direction from basin to desert floor. |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/08/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good |