Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
In review
Type:
Basin
Apply Date:
07/19/2023
Applicant:
Kelly
Description:
"South Basin", adjacent to lots 21-25, immediately Southwest of TE-BAS-0723-00087
Architects:
  • BJohnson
  • Desert Earth Contracting
  • KB Home
  • KB home land department
  • Rick Engineering Company
  • Rick Engineering Company, Inc.
  • Terramar Properties
  • TITILE SECURITY AGENCY LLC TR 201665-T ATTN: KB HOME TUCSON INC
Contractors:

Outstanding Plan Activity Conditions

Plan Number - TE-BAS-0723-00088
Plan Description: "South Basin", adjacent to lots 21-25, immediately Southwest of TE-BAS-0723-00087
Date Name Approved Comments
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. Not Approved 6385 S Ambarella Dr - P23WX01721 P23WX02130 6355 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 27 - #P23WX02157 6392 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 25 - #P23WX02134 6409 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 36 - #P23WX02129 6403 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 35 - #P23WX02130 6361 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 28 - #P23WX02131 6422 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 20 - #P23WX02327 6421 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 38 - #P23WX02328 6397 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 34 - #P23WX02563
08/11/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. Not Approved NO FINAL UNTIL THE PUBLIC SEWER G-2022-074 (P22WS00003/P22WI00031/P22SD00095) IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/27/2023 COT - BASN - Drainage/Basin - Annual Inspection - Recur Not Ready site is under construction.

Documents

File Name Document Type  
BASIN PLANS.PDF DOCUMENTS VIEW