Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
In review
Type:
Appeal - Building Official
Apply Date:
10/09/2026
Applicant:
Unknown
Description:
AT&T Upgrade to existing cell tower. TOWER WORK Install: 3 antennas, 1 hoisting anchor grip, 1 SQUID, 1 T-ARM Mount, 1 0.39" Fiber Trunk, 2 0.96" 6AWG DC Power Trunks, 6 back to back pipe mounts Replace: 6 antennas, 12 RRUs Remove: 1 T-ARM Mount, 3 TMAs GROUND WORK Install: 3 rectifiers, 1 6601 BBU, 2 6651 BBUs, 21 DC Breakers, 1 RAY38 Cabinet, 1 DC12-48-60-0-25E, 20 190AH Batteries, -58V RETROFIT Kit, 9 -58V Converters Replace: 12 Batteries
Architects:
  • Crafton Communications
  • MasTec Communications Group
  • MasTec Network Solutions LLC
Contractors:

Plan Reviews

Plan Number - TC-BCA-1026-00292
Plan Status: In Review
Plan Description: AT&T Upgrade to existing cell tower. TOWER WORK Install: 3 antennas, 1 hoisting anchor grip, 1 SQUID, 1 T-ARM Mount, 1 0.39" Fiber Trunk, 2 0.96" 6AWG DC Power Trunks, 6 back to back pipe mounts Replace: 6 antennas, 12 RRUs Remove: 1 T-ARM Mount, 3 TMAs GROUND WORK Install: 3 rectifiers, 1 6601 BBU, 2 6651 BBUs, 21 DC Breakers, 1 RAY38 Cabinet, 1 DC12-48-60-0-25E, 20 190AH Batteries, -58V RETROFIT Kit, 9 -58V Converters Replace: 12 Batteries
Start Date Submittal Complete Date Status  
10/14/2026 Building Official Appeal Review v.1 APPROVED Review Details