Apply Date:
03/13/2024
Applicant:
Susan
Description:
We propose this interconnection should fall under the guidance of 2023 NEC 705.12(B)(6) Install PV Solar Canopy 128.52 KW dc/ 100 KW ac Sister permit TC-COM-0124-00001 Dev Permit TD-DEV-0923-00395 THERE ARE 2 TEP METERS AT THIS ADDRESS
Architects:
- Solon
- SOLON Corporation
Contractors:
Plan Reviews
Plan Number - TC-BCA-0324-00010
Plan Status: Complete
Plan Description: We propose this interconnection should fall under the guidance of 2023 NEC 705.12(B)(6)
Install PV Solar Canopy 128.52 KW dc/ 100 KW ac
Sister permit TC-COM-0124-00001
Dev Permit TD-DEV-0923-00395
THERE ARE 2 TEP METERS AT THIS ADDRESS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/15/2024 | Building Official Appeal Review v.1 | APPROVED |