Plan: T22PI00013
Plan Details
Apply Date:
07/18/2022
Applicant:
Kelly
Description:
Public Paving Plans for The Reserve at Valencia Crossing - Near Valencia Rd & Littletown Rd - containing new roads of Ambarella Drive and Carambola Court, and modification of Littletown Road - includes new pavement, curb, sidewalk, ADA ramps, scuppers, and drainage.
Architects:
- Desert Earth Contracting
- KB Home
- Rick Engineering Company
- Rick Engineering Company, Inc.
Contractors:
Outstanding Plan Activity Conditions
Plan Number - T22PI00013
Plan Description: Public Paving Plans for The Reserve at Valencia Crossing - Near Valencia Rd & Littletown Rd - containing new roads of Ambarella Drive and Carambola Court, and modification of Littletown Road - includes new pavement, curb, sidewalk, ADA ramps, scuppers, and drainage.
Date | Name | Approved | Comments |
---|---|---|---|
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | Not Approved | 6385 S Ambarella Dr - P23WX01721 P23WX02130 6355 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 27 - #P23WX02157 6392 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 25 - #P23WX02134 6409 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 36 - #P23WX02129 6403 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 35 - #P23WX02130 6361 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 28 - #P23WX02131 6422 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 20 - #P23WX02327 6421 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 38 - #P23WX02328 6397 S Ambarella Drive – The Reserve at Valencia Crossing – Lot 34 - #P23WX02563 |
08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | Not Approved | NO FINAL UNTIL THE PUBLIC SEWER G-2022-074 (P22WS00003/P22WI00031/P22SD00095) IS ACCEPTED AND RELEASED BY PCRWRD |
Scheduled Inspections
Plan Number - T22PI00013
Plan Status: Complete
Plan Description: Public Paving Plans for The Reserve at Valencia Crossing - Near Valencia Rd & Littletown Rd - containing new roads of Ambarella Drive and Carambola Court, and modification of Littletown Road - includes new pavement, curb, sidewalk, ADA ramps, scuppers, and drainage.
Total Scheduled Inspections - 3
Scheduled Date | Description | Inspector | Status |
---|---|---|---|
02/05/2025 | TRSP - PIA - Signage/Striping Final | Scheduled | |
12/17/2024 | TRSP - PIA - Streets Final | Scheduled | |
02/05/2025 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Scheduled |
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/05/2025 | TRSP - PIA - Streets Final | Scheduled |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/15/2023 | TRSP - PIA - Pre-Construction Meeting | Passed | ||
04/04/2024 | TRSP - PIA - Signage/Striping Final | Passed | ||
02/05/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed |
Plan Reviews
Plan Number - T22PI00013
Plan Status: Complete
Plan Description: Public Paving Plans for The Reserve at Valencia Crossing - Near Valencia Rd & Littletown Rd - containing new roads of Ambarella Drive and Carambola Court, and modification of Littletown Road - includes new pavement, curb, sidewalk, ADA ramps, scuppers, and drainage.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/18/2022 | PIA - SUBMITTAL | 08/23/2022 | ACTIVE |
11/14/2022 | Private Improvement Agreement Review v.1 | APPROVED | |
06/27/2024 | Private Improvement Agreement Review v.1 | REQUIRES RESUBMIT | |
10/10/2024 | Private Improvement Agreement Review v.2 | APPROVED |