Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: SD-1124-00118
Plan Details
Apply Date:
11/20/2024
Applicant:
TFS
Description:
ARMORY PARK: Roof mount 13.33kW DC photovoltaic solar system; 31 modules; 27 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 2 strings each. Tesla Gateway 3. Partial house backup to existing 200A bus with 200A MCB panel. 400A main service with 2x200A MCB.
Architects:
- Technicians for Sustainability
Contractors:
Plan Reviews
Plan Number - SD-1124-00118
Plan Status: In Review
Plan Description: ARMORY PARK:
Roof mount 13.33kW DC photovoltaic solar system; 31 modules; 27 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 2 strings each. Tesla Gateway 3. Partial house backup to existing 200A bus with 200A MCB panel. 400A main service with 2x200A MCB.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/21/2024 | Historic Review v.1 | IN REVIEW |