Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
In review
Type:
Special Districts
Apply Date:
05/28/2026
Applicant:
Lu
Description:
The project includes a proposed 5'-0" high CMU wall with a silica sand stucco finish matching the existing residence, a steel sliding vehicular gate, a wood and steel pedestrian gate, and a localized ocotillo fence infill condition along the property perimeter.
Architects:
  • caelin
  • CAT Renovations LLC
Contractors:

Plan Reviews

Plan Number - SD-0526-00090
Plan Status: In Review
Plan Description: The project includes a proposed 5'-0" high CMU wall with a silica sand stucco finish matching the existing residence, a steel sliding vehicular gate, a wood and steel pedestrian gate, and a localized ocotillo fence infill condition along the property perimeter.
Start Date Submittal Complete Date Status  
06/01/2026 Historic Application Completeness Review Minor v.1 APPROVED Review Details