Plan: SD-0526-00087
Plan Details
Apply Date:
05/27/2026
Applicant:
Lori
Description:
The project is repair stucco with historically appropriate, traditional high-lime stucco to match original texture/finish. The doors will be replaced with metal clad with double pane glass in existing door opening. The windows to be replaced with metal clad wood casement. All windows and doors openings and style will remain same. The existing aluminum, roll-up garage door will be replaced with custom, in-swing, solid wood faced, double-carriage door to match existing within the development zone and compliance with the Design Guidelines.
Architects:
Contractors:
Plan Reviews
Plan Number - SD-0526-00087
Plan Status: Complete
Plan Description: The project is repair stucco with historically appropriate, traditional high-lime stucco to match original texture/finish. The doors will be replaced with metal clad with double pane glass in existing door opening. The windows to be replaced with metal clad wood casement. All windows and doors openings and style will remain same. The existing aluminum, roll-up garage door will be replaced with custom, in-swing, solid wood faced, double-carriage door to match existing within the development zone and compliance with the Design Guidelines.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2026 | Historic Application Completeness Review Minor v.1 | APPROVED |