Plan Details

Status:
Complete
Type:
Special Districts
Address:
136 W SIMPSON ST

Apply Date:
03/25/2025
Applicant:
TFS
Description:
27 kWh Storage addition to existing roof mounted PV system. 2 Tesla Powerwall-3 batteries. 200A bus with 175A MCB (de-rated from 200A), interconnection via PCS, Tesla Backup Switch for whole home backup. 14-50 NEMA rated outlet for EV charging with GFCI protection on 50A breaker.
Architects:
  • Technicians for Sustainability
Contractors:

Plan Reviews

Plan Number - SD-0325-00039
Plan Status: Complete
Plan Description: 27 kWh Storage addition to existing roof mounted PV system. 2 Tesla Powerwall-3 batteries. 200A bus with 175A MCB (de-rated from 200A), interconnection via PCS, Tesla Backup Switch for whole home backup. 14-50 NEMA rated outlet for EV charging with GFCI protection on 50A breaker.
Start Date Submittal Complete Date Status  
03/26/2025 Historic Application Completeness Review v.1 APPROVED Review Details