Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
Complete
Type:
Special Districts
Address:
945 N 5TH AV

Apply Date:
02/11/2026
Applicant:
Peter
Description:
The proposal is to build an attached garage (480 sq. ft.) at the rear of the contributing building facing East 1st Street, along with a new concrete driveway. A 77 sq. ft. addition will connect the existing residence to the proposed garage and will serve as a laundry room. The proposed North setback of 1’ 4” will require a variance. The addition and garage roofs will have shingles to match the existing residence. The garage and addition exterior walls will be clad in stucco. New and replacement windows will match existing lite patterns using simulated divided lites (or grilles between the glass) and will be double-hung wood clad and inset and recessed to match existing window patterns. Existing porch steps are to be removed and replaced with concrete steps. The project also includes a new picket fence above the existing North wall and new 16” columns at the front gate entrance.
Architects:
  • Tamarron Homes Inc.
Contractors:

Plan Reviews

Plan Number - SD-0226-00019
Plan Status: Complete
Plan Description: The proposal is to build an attached garage (480 sq. ft.) at the rear of the contributing building facing East 1st Street, along with a new concrete driveway. A 77 sq. ft. addition will connect the existing residence to the proposed garage and will serve as a laundry room. The proposed North setback of 1’ 4” will require a variance. The addition and garage roofs will have shingles to match the existing residence. The garage and addition exterior walls will be clad in stucco. New and replacement windows will match existing lite patterns using simulated divided lites (or grilles between the glass) and will be double-hung wood clad and inset and recessed to match existing window patterns. Existing porch steps are to be removed and replaced with concrete steps. The project also includes a new picket fence above the existing North wall and new 16” columns at the front gate entrance.
Start Date Submittal Complete Date Status  
03/17/2026 Administrative v.1 APPROVED Review Details
06/22/2026 Administrative v.1 APPROVED Review Details
02/12/2026 Historic Application Completeness Review v.1 REQUIRES RESUBMIT Review Details
03/05/2026 Historic Application Completeness Review v.3 APPROVED Review Details
02/19/2026 Historic Application Completeness Review v.2 REQUIRES RESUBMIT Review Details

Documents

File Name Document Type  
SD-0226-00019-NOTICE OF DECISION.PDF DOCUMENTS VIEW
SD-0226-00019_DESPCKG_APPROVED.PDF DOCUMENTS VIEW