Plan: S98-060
Plan Details
Apply Date:
11/04/1998
Applicant:
N/A
Description:
CANCIONES
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/1999 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/04/1999; Status: APPR; Inspector: JONEILL; Comment: Entered by JVOGELSB - APPROVED} ; {Activity date: 11/24/1998; Status: Correction Required; Inspector: PTHOMAS; Comment: Entered by JVOGELSB - CORRECTION REQUIRED} | |
| 03/22/1999 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/22/1999; Status: APPR; Inspector: JONEILL; Comment: Entered by JVOGELSB - APPROVED} ; {Activity date: 02/04/1999; Status: Correction Required; Inspector: JONEILL; Comment: Entered by JVOGELSB - CORRECTION REQUIRED} ; {Activity date: 11/24/1998; Status: Correction Required; Inspector: PTHOMAS; Comment: Entered by JVOGELSB - CORRECTION REQUIRED} | |
| 06/10/2005 | COT - WATR - Design Plan Construction | Passed | {Activity date: 06/10/2005; Status: Approved; Inspector: TACHONG; Comment: Entered by TACHONG1 - TUCSON WATER} | |
| 07/13/2001 | COT - ENGR - Site - Assurance Release | Passed | ||
| 11/25/2008 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 11/25/2008; Status: Approved; Inspector: JFEMLING; Comment: Entered by JFEMLIN1 - Received approval letter from Tom Stockett on 10/23/2006} |