Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2015 | COT - ENGR - Site - Assurance Release | Partial Pass | {Activity date: 08/18/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH MICHAEL OWENS OUT IN THE FIELD TO DETERMINE WHAT IS NEEDED FOR THIS SITE TO HAVE THE ASSURANCES TO BE CLOSED. THE TRANSPORTATION AND PERMITS AND CODES SECTIONS HAVE APPROVED THIS SITE, AS WELL AS PIMA COUNTY WASTE WATER. THE TUCSON WATER DEPARTMENT HAS PROVIDED A MEMO DATED 6/13/02, FROM LORENZO HERNANDES STATING} ; {Activity date: 09/28/2010; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - RELOOKED AT THE SITE AND VERIFIED THAT THE SURVEY MONUMENTS WERE IN THAT WERE NOT FOUND DURING YESTERDAYS SITE VISIT. ALSO MET WITH THE ENGINEER OF RECORD MICHAEL OWENS TO DISCUSS WHAT IS STILL NEEDED FOR THIS SITE TO BE CLOSED OUT. I WILL CONSULT WITH JIM VOGELSBERG AND MATTHEW FLICK ABOUT ALL OF THE REMAINING WORK ON THIS SITE THAT HAS NOT BEEN DONE. IT WILL BE MY RECOMMENDATION TO PLACE ALL OF THE REMAINING ASSURABLE AND GRADING ITEMS ONTO THE COMBO PERMIT FOR EACH ADJACENT LOT. THIS WAY ALL OF THE REMAINING WORK CAN BE INSPECTED PRIOR TO THE ISSUANCE OF THE FINAL C OF O.} ; {Activity date: 09/27/2010; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE HAS BEEN CHECKED TO SEE IF IT WAS ADEQUATE ENOUGH TO DO A FULL RELEASE OF THE SITE. IT APPEARS THAT ALL OF THE ASSURE ABLE ITEMS HAVE BEEN COMPLETED ENOUGH TO ALLOW FOR A FINAL RELEASE OF THE SITE. THE GRADING PLAN FOR THIS SITE HAS ALREADY BEEN RELEASED BY JIM FEMLING. THE SITE APPEARS TO BE MISSING SOME OF THE NEW TREES THAT HAVE BEEN CALLED OUT IN THE LANDSCAPING PLAN AS WELL AS SOME OF THE EXTERIOR WALLS THAT HAVE NOT YET BEEN CONSTRUCED. I WILL REVISIT THE SITE ON 9/28/2010 WITH THE LANDSCAPING AND GRADING PLANS TO TRY AND VERIFY ALL THAT HAS NOT BEEN CONSTRUCED ON THIS SITE PER THE APPROVED PLANS.} ; {Activity date: 02/01/2007; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE FINAL RELEASE OF THE ASSURANCES AT THIS TIME AND FOUND TO BE INCOMPLETE. ON THIS SITE THE ROADWAY, UTILITIES, AND CURBS HAVE BEEN CONSTRUCTED THROUGHOUT THE SITE. THREE OF THE LOTS HAVE BEEN DEVELOPED AT THIS TIME, ALL OTHERS MAY REQUIRE SIDEWALKS AND DRIVEWAYS.} |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2001 | SPECIAL INSPECTION - OTHER (Third Party) | Passed | {Activity date: 11/01/2001; Status: Approved; Inspector: SRAVAL; Comment: Entered by KMEDINA1 - SEE SIRE} | |
| 09/29/2010 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 09/29/2010; Status: Approved; Inspector: J Ortiz; Comment: Entered by DROBERT2 - TDOT-Traffic has no objection to the release of assurances. J Ortiz} |