Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2019 | ASSURANCE - DOT TRAFFIC | RLEIGH | Approved | Sidewalk along the frontage of lots 2 and 4 have been completed and approved by TDOT. It was built under one permit T18RW04233 |
| 01/28/2019 | ASSURANCE - PC WASTEWATER | JV | Approved | |
| 01/28/2019 | ASSURANCE - PC WASTEWATER | JV | Approved | |
| 01/28/2019 | ASSURANCE - UTILITY SERVICES | JV | Approved | Water service supplied |
| 01/28/2019 | ASSURANCE - DOT TRAFFIC | JV | Approved | T18RW04233. Per Richard Leigh, Sidewalk has been installed and approved for lot 2 |
| 02/07/2019 | ASSURANCE - DSD | AH | Approved | Sidewalk approval through TDOT. |