Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S18-019
Plan Details
Apply Date:
02/03/2022
Applicant:
Unknown
Description:
Desert Point 2 Lots 1-41
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- erin
- Title Security Agency, LLC, a Delaware limited liability com. trust 202065-S as trustee, Ronda Tatro
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2019 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 11/08/2019; Status: Approved; Inspector: JV; Comment: Entered by JVWINKL1 - See Pima County acceptance letter in SITE. reference P19W00036} | |
03/18/2020 | COT - WATR - Design Plan Construction | Passed | {Activity date: 03/18/2020; Status: Approved; Inspector: AHINES; Comment: Entered by AHINES2 - Ray Water Accepted} | |
05/25/2022 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 05/25/2022; Status: Approved; Inspector: RL; Comment: Entered by RLEIGH1 - } | |
07/22/2022 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 07/22/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} ; {Activity date: 11/12/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - PARTIAL, OK TO RELEASE THE FOLLOWING LOTS 19 AND 41 AT THIS TIME. THIS SITE IS NOT READY AT THIS TIME FOR THE FINAL APPROVAL AND FULL RELEASE OF THE ASSURANCES. COMPLETE ALL THE REMAINING WORK FOR THE DEVELOPMENT PACKAGE AND THEN SCHEDULE ALL REMAINING INSPECTIONS FOR BOTH PERMITS S18-019 and DP17-0102 } ; {Activity date: 10/16/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - PARTIAL, OK TO RELEASE LOTS 12, 18, and 23} ; {Activity date: 08/07/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. OK for lots requested for release by John Vanwinkle. Not a full release.} ; {Activity date: 07/24/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - PARTIAL AT THIS TIME, OK TO RELEASE THE FOLLOWING LOTS 5,6,13,14,15,16. SIDEWALKS, STEPS AND DRIVEWAYS WILL BE CHECKED AT A LATER DATE FOR COMPLIANCE.} ; {Activity date: 06/25/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lot 22} ; {Activity date: 05/29/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 4,8,20,25,30,35,38} ; {Activity date: 03/26/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TO RELEASE THE FOLLOWING LOTS 3, 9, 10, 11, 40} ; {Activity date: 02/26/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - Lots 7/31/33/34/35/36. OK for release. } ; {Activity date: 02/26/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - OK to release lots 7-31-33-34-35 and36} ; {Activity date: 12/20/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lot 32} ; {Activity date: 12/16/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - for lot 32.} ; {Activity date: 10/17/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THE FOLLOWING LOTS ARE OKAY TO BE RELEASED AT THIS TIME, 26,27,28,29,37,39. ADDITIONAL RELEASES WILL NOT BE DONE UNTIL AN ADDITIONAL INSPECTION IS COMPLETED. COMMON AREA “A” & “B” HAVE BEEN COMPLETED BUT HAVE NOT BEEN FINALED ATTHIS TIME, THESE WILL BE RE-INSPECTED ONCE ALL WORK HAS BEEN COMPLETED AS SHOWN ON THE APPROVED PLANS. LOT NUMBER 22 IS THE MODEL HOME, AND LOT NUMBER 23 IS THE PARKING LOT FOR THE ADJACENT MODEL HOME.} |
Plan Reviews
Plan Number - S18-019
Plan Status: Submitted
Plan Description: Desert Point 2 Lots 1-41
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/05/2018 | SUBPLAT- OK TO SUBMIT | 03/08/2018 | COMPLETED |
03/09/2018 | FINAL PLAT - REVIEW | 05/02/2018 | COMPLETED |
03/12/2019 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 04/10/2019 | COMPLETED |
05/02/2018 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 06/11/2018 | COMPLETED |
05/08/2019 | FINAL PLAT - PACKAGE | 05/16/2019 | COMPLETED |
06/23/2020 | ASSURANCES | 06/23/2020 | COMPLETED |
11/20/2018 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 12/27/2018 | COMPLETED |