Plan: S17-075
Plan Details
Apply Date:
12/07/2017
Applicant:
Unknown
Description:
18th BUNGALOWS
Architects:
- jae1945
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/16/2018 | COT - WATR - Design Plan Construction | Passed | {Activity date: 10/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - APPROVED AT THIS TIME SINCE ALL OF THE HOME WATER SERVICES HAVE BEEN UNDER A SEPERATE PERMIT THROUGH THE WATER DEPARTMENT.} | |
10/17/2018 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 10/17/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - AFTER TALKING WITH JERRY/PIMA COUNTY WASTE WATER AND THE ISSUANCE OF PERMIT NUMBER P17WS00015 THIS SITE IS BEING APPROVED AT THIS TIME.} | |
10/18/2018 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 10/18/2018; Status: Approved; Inspector: RLEIGH; Comment: Entered by RLEIGH1 - } | |
11/13/2018 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 11/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/17/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL REMAINING INSPECTIONS FOR THIS SITE BY THE CITY OF TUCSON TRANSPORTATION DEPARTMENT PRIOR TO REQUESTING THIS FINAL INSPECTION.} ; {Activity date: 10/15/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - HOMES HAVE BEEN CONSTRUCTED BUT THE FINAL CANNOT BE GIVEN AT THIS TIME TILL ALL OTHER INSPECTIONS HAVE BEEN COMPLETED AND APPROVED.} |
Plan Reviews
Plan Number - S17-075
Plan Status: Approved
Plan Description: 18th BUNGALOWS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/22/2018 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 04/23/2018 | COMPLETED |
04/23/2018 | FINAL PLAT - PACKAGE | 05/03/2018 | COMPLETED |
12/07/2017 | SUBPLAT- OK TO SUBMIT | 12/08/2017 | COMPLETED |
12/08/2017 | FINAL PLAT - REVIEW | 02/22/2018 | COMPLETED |