Plan Details

Status:
Approved
Type:
Land Division
Address:
4275 N STONE AV

Apply Date:
06/30/2017
Applicant:
Peter
Description:
Stone Lane Homes, Lots 1-12
Architects:
  • City of Tucson DTM Streets and Traffic Maintenance
  • NAPILI HOLDINGS AT STONE LANE LLC
  • Oracle Engineering Group, Inc.
  • PIONEER TITLE AGENCY
Contractors:

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/10/2019 SPECIAL INSPECTION - Pima County Sewer (Third Party) Passed {Activity date: 06/10/2019; Status: Approved; Inspector: JV; Comment: Entered by JVWINKL1 - Reference PCRWRD G-2017-092, uploaded to SIRE}
07/23/2019 COT - ENGR - Site - Assurance Release Passed {Activity date: 07/23/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/07/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - OK TOO RELEASE LOT #4} ; {Activity date: 06/07/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE INITIAL RELEASE OF THE LOTS AS THEY ARE INSPECTED. THE DEVELOPER HAS SUBMITTED THE PLANS FOR THE CHANGES TO STONE FOR ADDING AN ADDITIONAL 30 FOOT LENGTH TOO THE EXISTING MEDIAN ISLAND. THE REVIEW TIME FOR THIS WORK IS ANTICIPATED TO TAKE UPTO 6 WEEKS BY THE TRANSPORTATION DEPARTMENT.
LOT #4 CAN BE RELEASED AT THIS TIME} ; {Activity date: 04/30/2019; Status: Follow-up inspection; Inspector: JV; Comment: Entered by JVWINKL1 - No release of lots until median access on Stone has been provided}
07/23/2019 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 07/23/2019; Status: Approved; Inspector: Rleigh; Comment: Entered by RLEIGH1 - }
08/01/2019 COT - WATR - Design Plan Construction Passed {Activity date: 08/01/2019; Status: Approved; Inspector: JV; Comment: Entered by JVWINKL1 - Reference Tucson Water Plan no 2-138-2017}

Plan Reviews

Plan Number - S17-033
Plan Status: Approved
Plan Description: Stone Lane Homes, Lots 1-12
Start Date Submittal Complete Date Status  
06/30/2017 SUBPLAT- OK TO SUBMIT 06/30/2017 COMPLETED Review Details
06/30/2017 FINAL PLAT - REVIEW 10/24/2017 COMPLETED Review Details
11/08/2017 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 11/16/2017 COMPLETED Review Details
11/16/2017 FINAL PLAT - PACKAGE 11/30/2017 COMPLETED Review Details

Documents

File Name Document Type  
FINAL PLAT_SHT 1 OF 2.TIF PLATS VIEW
FINAL PLAT_SHT 2 OF 2.TIF PLATS VIEW
S17-033_ASSURANCE.PDF ASSURANCES VIEW
S17-033 SPECIAL WARRANTY DEED.PDF ASSURANCES VIEW
SUBSTITUTE ASSURANCE.PDF ASSURANCES VIEW
S17-033 PARTIAL RELEASE, 06.11.19.PDF ASSURANCES VIEW
TUCSON WATER FINAL 2-138-2017.PDF ASSURANCES VIEW
S17-033 ASSURANCE LOG.XLS ASSURANCES VIEW
S17-033,FULL RELEASE, 08.01.19.PDF ASSURANCES VIEW
1_STONE LANE_S17-033_ADDRESSING.PDF DOCUMENTS VIEW
1_STONE LANE FINAL PLAT 07-27-17_TEP.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW