Plan: S16-057
Plan Details
Apply Date:
08/08/2016
Applicant:
Unknown
Description:
Elementary Place, Lots 1-54
Architects:
- The WLB Group Inc.
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2017 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 12/06/2017; Status: Approved; Inspector: PMULVEY; Comment: Entered by AHINES2 - Wastewater approval letter in SIRE.} | |
| 01/02/2018 | COT - WATR - Design Plan Construction | Passed | {Activity date: 01/02/2018; Status: Approved; Inspector: kl; Comment: Entered by KLEE1 - Water acceptance letter in SIRE} | |
| 03/14/2018 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 03/14/2018; Status: Approved; Inspector: RLEIGH; Comment: Entered by RLEIGH1 - } | |
| 06/08/2018 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 06/08/2018; Status: Approved; Inspector: KL; Comment: Entered by KLEE1 - Approved per Dave Roberts. DP remains open for remainder of subdivision development and SWPPP.} ; {Activity date: 05/02/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OKAY TO RELEASE LOTS #38, #41, AND #50} ; {Activity date: 01/31/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - STILL OKAY TO RELEASE THE FOLLOWING LOTS 14, 39, 40, 43 and 47, ALL OTHER LOTS WILL BE HELD TILL THE ENGINEER OF RECORD HAS PROVIDED DOCUMENTATION FOR ALL OF THE LOTS ON THIS SITE.} ; {Activity date: 01/23/2018; Status: Partial Approval; Inspector: KL; Comment: Entered by KLEE1 - Ok for release of lots Lots 14, 39, 40, 43 and 47. See engineer of record below. From: Leroy Ryan Sent: Wednesday, January 10, 2018 7:42 AM To: Robert Longaker <rlongaker@wlbgroup.com> Subject: Elementary Place Rob - I completed a visual inspection of the grading for Lots 14, 39, 40, 43 and 47 at Elementary Place. They appear to be graded in conformance with the approved Grading Plan for a Type A lot. Lee Ryan Senior Construction Manager The WLB Group, Inc. Engineering • Planning • Surveying • Urban Design • Landscape Architecture Tucson • Phoenix • Flagstaff • Las Vegas • www.wlbgroup.com 4444 E. Broadway Blvd. • Tucson, AZ 85711-3508 520.881.7480 • 520.360.0954 (cell) • 520.881.7492 (fax) lryan@wlbgroup.com} ; {Activity date: 12/22/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE INITIAL RELEASE OF LOTS 1 AND 2 ONLY AT THIS TIME TO BE UTILIZED AS MODELS, ALL OTHER RELEASES WILL NOT BE ALLOWED TILL THE ENGINEER OF RECORD HAS PROVIDED US WITH HIS SEALED CERTIFICATION LETTER.} ; {Activity date: 11/22/2017; Status: Denied; Inspector: kl; Comment: Entered by KLEE1 - Initial release of lots denied. No inspections called in. Dave Roberts requested Engineer of Record to supply letter that improvements were built to plan.} |
Plan Reviews
Plan Number - S16-057
Plan Status: Approved
Plan Description: Elementary Place, Lots 1-54
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/08/2016 | SUBPLAT- OK TO SUBMIT | 08/09/2016 | COMPLETED |
| 08/09/2016 | FINAL PLAT - REVIEW | 08/31/2016 | COMPLETED |
| 09/09/2016 | FINAL PLAT - REVIEW | 09/26/2016 | COMPLETED |
| 09/26/2016 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 09/27/2016 | COMPLETED |
| 09/27/2016 | FINAL PLAT - PACKAGE | 09/30/2016 | COMPLETED |
| 09/30/2016 | FINAL PLAT - PACKAGE | 10/14/2016 | COMPLETED |