Plan: S16-050
Plan Details
Apply Date:
07/06/2016
Applicant:
Unknown
Description:
RANCHO REINA FINAL PLAT
Architects:
- KPERRY
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2017 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 06/23/2017; Status: Approved; Inspector: KL; Comment: Entered by KLEE1 - Final Wastewater Approval for Lots 1-25. See SIRE.} | |
| 09/26/2017 | COT - WATR - Design Plan Construction | Passed | {Activity date: 09/26/2017; Status: Approved; Inspector: pyg; Comment: Entered by PGEHLEN1 - First action should have been an approval.} ; {Activity date: 06/14/2017; Status: Partial Approval; Inspector: pyg; Comment: Entered by PGEHLEN1 - Tucson Water letter in SIRE} | |
| 01/18/2018 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 01/18/2018; Status: Approved; Inspector: Rleigh; Comment: Entered by RLEIGH1 - } | |
| 01/22/2018 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 01/22/2018; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - SITE IS READY FOR THE CLOSURE OF THE ASSURANCES. ALL REMAINING ITEMS FOR THIS SITE WILL BE ATTACHED TO DP17-0302 FOR ALL FINAL INSPECTIONS EXCEPT ALL SIDEWALKS AND DRIVEWAYS WILL BE ATTACHED TO EACH REMAINING UNCONSTRUCTED HOME AT THIS TIME. THIS WILL INCLUDE THE FOLLOWING LOT NUMBERS ON THIS DEVELOPMENT: } ; {Activity date: 10/12/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE INITIAL RELEASE OF LOTS AT THIS TIME. FINAL NOT TO BE GIVEN TILL ALL OF THE WORK IS COMPLETED AS NOTED ON THE APPROVED PLANS, AND ALL INSPECTIONS ARE COMPLETE.} |