Plan: S15-051
Plan Details
Apply Date:
10/30/2015
Applicant:
THOMPSON, WARREN D
Description:
SUBC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2017 | ASSURANCE - UTILITY SERVICES | pyg | Approved | Revised letter from Tucson Water: Missing lot 77. TW verified that lot 77 has water service |
07/06/2018 | ASSURANCE - PC WASTEWATER | SQUINLAN | Approved | The Final Acceptance and Discharge Authorization have been approved for G-2016-007 MOUNTAIN VAIL ESTATES PART G - PHASE II, LOTS 15-48 and 83-89, SEWER CONSTRUCTION PERMIT #P17WP00162, PDEQ #05316 . Thank you, Sylvia Quinlan Engineer Plans Technician Pima County- RWRD Planning & Engineering Division 201 N Stone Ave, 3rd Floor Tucson, AZ 85701 Office (520)724-6649 |
10/05/2018 | ASSURANCE - DOT PERMITS & CODE | ECRUZ | Approved | SEE TDOT ACCEPTANCE LETTER IN DOCUMENTS TABLE ON PRO (SIRE). |
10/05/2018 | ASSURANCE - DOT TRAFFIC | ECRUZ | Approved | SEE TDOT ACCEPTANCE LETTER IN DOCUMENTS TABLE ON PRO (SIRE). |
12/03/2019 | ASSURANCE - DSD | JV | Approved | ok to release lots 16,34 and 41 |
Plan Reviews
Plan Number - S15-051
Plan Status: Final
Plan Description: SUBC
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/28/2016 | RESUBMITTAL - FINAL PLAT - CONDO CONVERSION | 02/02/2016 | COMPLETED |
02/04/2016 | FINAL PLAT - PACKAGE | 02/09/2016 | COMPLETED |
10/30/2015 | FINAL PLAT - REVIEW | 11/02/2015 | COMPLETED |
10/30/2015 | FINAL PLAT - REVIEW | 12/23/2015 | COMPLETED |
12/23/2015 | RESUBMITTAL - FINAL PLAT - CONDO CONVERSION | 01/28/2016 | COMPLETED |