Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S15-030
Plan Details
Apply Date:
07/24/2015
Applicant:
JON WARD
Description:
SUBC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/06/2016 | ASSURANCE - UTILITY SERVICES | PB | Approved | |
07/25/2017 | ASSURANCE - PC WASTEWATER | KL | Approved | Wastewater Approval Letter uploaded to SIRE. |
12/21/2017 | ASSURANCE - DOT PERMITS & CODE | rleigh1 | Approved | TDOT has no objection to allowing up to 90% of the lot releases. The developer is currently working on the outstanding punchlist items within the ROW. |
12/28/2017 | ASSURANCE - DSD | DROBERTS | Approved | COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS FOR THIS SITE PRIOR TO CALLING IN FOR THE FINAL RELEASE OF THE ASSURANCES. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE SIDEWALKS AND DRIVEWAYS, LANDSCAPING, AND ALL WORK WITHIN THE COMMON AREAS AS SHOWN ON THE APPROVED PLANS FOR THIS SITE. A PEDESTRIAN PATHWAY HAD NOT BEEN COMPLETEDON ONE OF THE PREVIOUS INSPECTIONS. THIS PATHWAY IS LOCATED ON THE EAST SIDE OF LOT #46, IT ISUTILIZED TO ALLOW PEDESTRIANS TO HAVE AN ACCESSABLE PATH FROM VANCOUVER DRIVE TO KINNISON WASH LOOP. THIS PATHWAY NEEDS TO BE INSTALLED AND HAVE SLOPE VALUES OF NO GREATER THAN 2% IN ALL DIRECTIONS. |
02/20/2018 | ASSURANCE - DOT TRAFFIC | Rleigh | Approved |
Plan Reviews
Plan Number - S15-030
Plan Status: Final
Plan Description: SUBC
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/11/2016 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 02/18/2016 | COMPLETED |
02/16/2016 | FINAL PLAT - PACKAGE | 02/29/2016 | COMPLETED |
07/24/2015 | SUBPLAT- OK TO SUBMIT | 07/24/2015 | COMPLETED |
07/24/2015 | FINAL PLAT - REVIEW | 09/30/2015 | COMPLETED |
09/30/2015 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 11/05/2015 | COMPLETED |