Plan: S14-049
Plan Details
Apply Date:
10/28/2014
Applicant:
ZACH HINMAN
Description:
SUBC
Outstanding Plan Activity Conditions
Plan Number - S14-049
Plan Description: SUBC
Date | Name | Approved | Comments |
---|---|---|---|
10/28/2014 | RECEIVED LETTER OF CERTIFICATION | Not Approved |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/08/2016 | ASSURANCE - DSD | DROBERTS | Approved | MET WITH ZACH HINMAN AND DISCUSSED THE ISSUES THAT I AM NOTICING ON THIS SITE. THE BASINS HAVE BEEN COLLECTING SOME OF THE SILTS FROM THE SITE AND NEED TO BE CLEANED PRIOR TO THEM PLACING THE DG FOR THE FINAL PLACEMENT. I HAVE ALSO ASKED HIM TO PROVIDE ME THE LOT NUMBERS AND ADDRESSES SO THAT A ASSURANCE INSPECTION CAN BE PLACED ON EACH OF THE LOTS, |
10/07/2016 | ASSURANCE - PC WASTEWATER | PB | Approved | Approval letter has been placed in Sire. |
10/07/2016 | ASSURANCE - UTILITY SERVICES | PB | Approved | Approval letter has been placed in Sire. |
07/27/2017 | ASSURANCE - DOT TRAFFIC | RLEIGH | Approved | THIS SIGN OFF IS BEING PLACED INTO PERMIT PLUS PER THE PHONE CONVERSATION WITH RICHARD LEIGH ON THIS DATE AT THIS TIME NOTING THAT THEY APPROVE THE SITE. |
07/27/2017 | ASSURANCE - DOT PERMITS & CODE | RLEIGH | Approved | THIS SIGN OFF IS BEING PLACED INTO PERMIT PLUS PER THE PHONE CONVERSATION WITH RICHARD LEIGH ON THIS DATE AT THIS TIME NOTING THAT THEY APPROVE THE SITE. |
Plan Reviews
Plan Number - S14-049
Plan Status: Final
Plan Description: SUBC
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/09/2015 | FINAL PLAT - PACKAGE | 01/22/2015 | COMPLETED |
10/28/2014 | FINAL PLAT - REVIEW | 10/28/2014 | COMPLETED |
10/28/2014 | FINAL PLAT - REVIEW | 12/04/2014 | COMPLETED |
12/04/2014 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 01/09/2015 | COMPLETED |