Plan: S08-057
Plan Details
Apply Date:
05/01/2008
Applicant:
Unknown
Description:
SENTINEL VISTAS
Architects:
- bright
- City of Tucson DTM Streets and Traffic Maintenance
- M AND R INVESTMENTS
- TICOR TITLE AGENCY OF ARIZONA
Contractors:
Outstanding Plan Activity Conditions
Plan Number - S08-057
Plan Description: SENTINEL VISTAS
Date | Name | Approved | Comments |
---|---|---|---|
05/01/2008 | RECEIVED LETTER OF CERTIFICATION | Not Approved |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2009 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 10/27/2009; Status: Approved; Inspector: THARVISON; Comment: Entered by KMEDINA1 - SEE EMAIL IN SIRE} | |
05/05/2020 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 05/05/2020; Status: Closed; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE HAS NOT BEEN CONSTRUCTED PER THE APPROVED PLANS AND THIS PERMIT INSPECTION IS CLOSED AT THIS TIME. PLANS HAVE BEEN DESTROYED} ; {Activity date: 10/01/2009; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - OKAY FOR THE INITIAL RELEASE. THERE ARE SOME MINOR QUESTIONS ABOUT THE ROADWAY WIDTHS BEING UNDER 20 AND A FEW OF THE PEDESTRIAN ACCESS AREAS ARE LESS THAN 4 FEET WIDE.} ; {Activity date: 09/03/2009; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT2 - SITE WAS CHECKED FOR THE INITIAL RELEASE BUT COULD NOT BE INSPECTED DUE TO THE GATES BEING LOCKED WHEN I CHECKED AT AROUND 12:00. A RE-INSPECTION OF THE SITE WILL BE NEEDED PRIOR TO APPROVING FOR THE INITIAL RELEASE.} |
Plan Reviews
Plan Number - S08-057
Plan Status: Approved
Plan Description: SENTINEL VISTAS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/02/2008 | FINAL PLAT - CONDO CONVERSION | 06/19/2008 | COMPLETED |
08/18/2008 | RESUBMITTAL-FINAL PLAT - CONDO CONVERSION | 09/19/2008 | COMPLETED |
08/18/2008 | ASSURANCES | 09/16/2008 | COMPLETED |
11/12/2008 | RESUBMITTAL-FINAL PLAT - CONDO CONVERSION | 12/04/2008 | COMPLETED |
12/12/2008 | RESUBMITTAL-FINAL PLAT - CONDO CONVERSION | 12/16/2008 | COMPLETED |
12/15/2008 | ASSURANCES | 12/19/2008 | COMPLETED |
12/16/2008 | FINAL PLAT PACKAGE | 01/08/2009 | COMPLETED |