Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S06-071
Plan Details
Apply Date:
03/27/2006
Applicant:
Unknown
Description:
LA ESTANCIA DE TUCSON 419-674
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- JAMES.KNIPE
- LENNAR ARIZONA
- MERITAGE HOMES OF ARIZONA INC
- Title Security Agency, LLC, a Delaware limited liability com. trust 202065-S as trustee, Ronda Tatro
Contractors:
Outstanding Plan Activity Conditions
Plan Number - S06-071
Plan Description: LA ESTANCIA DE TUCSON 419-674
Date | Name | Approved | Comments |
---|---|---|---|
03/27/2006 | RECEIVED LETTER OF CERTIFICATION | Not Approved |
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/06/2020 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Partial Pass | {Activity date: 08/06/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - see partial approval G-2016-086 lots 411-444,459-482} ; {Activity date: 03/11/2020; Status: Partial Approval; Inspector: AHINES; Comment: Entered by AHINES2 - Wastewater Acceptance in record for lots 584-625 & 635-664} ; {Activity date: 09/21/2018; Status: Partial Approval; Inspector: Kl; Comment: Entered by KLEE1 - Wastewater Approval in PRO for lots 523-583 & 626-634} ; {Activity date: 09/21/2018; Status: Partial Approval; Inspector: Kl; Comment: Entered by KLEE1 - Wastewater Acceptance for 445-458 & 483-522} | |
02/09/2021 | COT - WATR - Design Plan Construction | Partial Pass | {Activity date: 02/09/2021; Status: Partial Approval; Inspector: SBeasley; Comment: Entered by SBEASLE1 - Recvd Tucson Water approval letter, email and plat. Lots 411-443 and 459-482. Saved in OnBase/PRO today, 02/09/2021.} ; {Activity date: 08/06/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - see tucson water approval letter plan 6A 2-114-2016 lots 441-443 and 459-482} ; {Activity date: 08/06/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - see tucson water acceptance letter plan 2-132-2016 lots 444-458,483-522} ; {Activity date: 04/02/2020; Status: Partial Approval; Inspector: AHINES; Comment: Entered by AHINES2 - Water acceptance for Lots 523 thru 664} ; {Activity date: 08/24/2018; Status: Partial Approval; Inspector: KL; Comment: Entered by KLEE1 - Phase 7- Lots 710-718. See Letter in SIRE.} ; {Activity date: 08/21/2018; Status: Partial Approval; Inspector: kl; Comment: Entered by KLEE1 - Water Acceptance for Lots 523-583 and 626-634. See Letter in SIRE.} | |
06/10/2022 | COT - ENGR - Site - Assurance Release | Re-inspection required | {Activity date: 06/10/2022; Status: Denied; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS DENIED AT THIS TIME, NOT READY FOR A FULL AND FINAL RELEASE AT THIS TIME. ANOTHER INSPECTION WILL BE RESCHEDULED FOR 6/13-14/2022 TO ENSURE THAT THE DEVELOPMENT PACKAGE HAS BEEN COMPLETED PER THE APPROVED PLANS. } ; {Activity date: 04/29/2022; Status: Denied; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS DENIED AT THIS TIME TILL I HAVE VERIFIED THAT THE ASSOCIATED DEVELOPMENT PACKAGE HAS BEEN APPROVED.} ; {Activity date: 04/13/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - OK TO RELEASE LOT 661} ; {Activity date: 06/16/2021; Status: Partial Approval; Inspector: DRBOBERTS; Comment: Entered by DROBERT5 - IS PARTIAL, OK TO RELEASE THE FOLLOWING LOTS 433,434,435,436,437.} ; {Activity date: 02/10/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TO RELEASE THE FOLLOWING LOTS 411,412,413,414,432,438,439.} ; {Activity date: 01/12/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VLEON1 - PARTIAL AT THIS TIME, OK TO RELEASE LOTS 428 & 429.} ; {Activity date: 12/31/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by MHERNAN1 - OK TO RELEASE THE FOLLOWING LOT #415} ; {Activity date: 12/14/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - THE FOLLOWING LOTS ARE OK FOR RELEASE LOTS 431, 440, and 441.} ; {Activity date: 10/30/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR A PARTIAL RELEASE FOR THE FOLLOWING LOTS 499,500,501,502,503,504,508,509} ; {Activity date: 10/27/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - partial approval. OK for lot release # 417, 418, 419.} ; {Activity date: 10/19/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - partial approval. OK to release Lots 416,420,430,442.} ; {Activity date: 07/31/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - LOTS 421-427, 443, 444, 459 - 464 ARE OK FOR A RELEASE AT THIS TIME, THE SIDEWALKS AND DRIVEWAYS WILL BE CHECKED AT A LATER DATE FOR ADA COMPLIANCE. THESE LOTS ARE BEING FORMED AT THIS TIME FOR HOUSE CONCRETE SLAB. } ; {Activity date: 06/18/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to rlease lots 471,476,477,478} ; {Activity date: 06/04/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. Request for lot releases.445,447,451,452,465,469,& 479-482.OK to release.} ; {Activity date: 04/02/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by VFLORES1 - SEE NOTES PROVIDED BY DAVE ROBERTS 4-2-2020} ; {Activity date: 04/02/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING LOTS ARE OK TO BE RELEASED AT THIS TIME: LOTS 448 - 450, 510 - 512, 521 - 522, 470 - 475, 588, AND 664.} ; {Activity date: 03/13/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by SFLORES2 - LOTS 638 & 650 ARE OK TO BE RELEASED AT THIS TIME. ADDITIONAL RELEASES WILL REQUIRE ANOTHER INSPECTION DUE TO THE INCOMPLETENESS OF THE FULL SITE.} ; {Activity date: 03/11/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by SFLORES2 - , THE REQUESTED LOTS CAN BE RELEASED AT THIS TIME. THIS SITE IS NOT READY FOR A FULL RELEASE DUE TOTHE AMOUNT OF INCOMPLETE WORK. THIS SITE MAY BE RELEASED IF A SUBSTITUTE ASSURANCE IS SUBMITTED FOR A COMPLETION BOND. CONTACT ALEXANDRA HINES AT (520) 791-5550 AT 201 N STONE TO DETERMINE WHAT IS NEEDED. A LIST OF INCOMPLETE ITEMS WILL BE RECORDED LATER THIS WEEK.} ; {Activity date: 01/28/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 639-646,655,656,658,659,660} ; {Activity date: 01/07/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 647,649,652} ; {Activity date: 12/03/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 636 and 637} ; {Activity date: 10/31/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 585,586,600} ; {Activity date: 10/21/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lot 598} ; {Activity date: 10/15/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Assurances is OK for 584 589 five 9591 592 593 594 596 and 597.} ; {Activity date: 09/25/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 603,604,606,608} ; {Activity date: 09/12/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lot 615} ; {Activity date: 08/28/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 609,910,911,913,914,616-619} ; {Activity date: 08/12/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 612 and 624} ; {Activity date: 06/26/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE CHECKED FOR THE RELEASE OF LOTS 620 TO 623 and 625, OK AT THIS TIME.} ; {Activity date: 04/01/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TO RELEASE LOTS489-498 AND 505-507} ; {Activity date: 01/15/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TO RELEASE THE FOLLOWING LOTS 550, 552, 553, 557, 558, 540, 543, 547-549, 551, 556, 552, 562, 563, 565-583, AND 626-634} ; {Activity date: 12/06/2018; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by AHINES2 - lots 541, 542, 554, 555, 559, 560, 561 served by common-elements} ; {Activity date: 11/01/2018; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - 539, 544, 564, lots okay for release.} ; {Activity date: 09/21/2018; Status: Partial Approval; Inspector: Kl; Comment: Entered by KLEE1 - See Agreement in PRO for Access requirements based on #of lots.} ; {Activity date: 09/17/2018; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS REQUEST IS NOT BEING ACCEPTED AT THIS TIME. THIS AREA WILL NEED TO HAVE IT DEMONSTRATED HOW YOU ARE MEETING THE FIRE REQUIREMENTS FOR 2 ACCESS POINTS INTO AND OUT OFTHIS AREA. CONTACT THE TUCSON FIRE DEPARTMENT TO GET CLARIFICATION OF WHAT ROADWAYS ARE NEEDED TO ALLOW RELEASE OF HOMES IN THESE AREAS.} |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/06/2020 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 03/06/2020; Status: Approved; Inspector: rleigh1; Comment: Entered by RLEIGH1 - } |
Plan Reviews
Plan Number - S06-071
Plan Status: Approved
Plan Description: LA ESTANCIA DE TUCSON 419-674
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/07/2020 | ASSURANCES | 05/04/2020 | COMPLETED |
03/28/2006 | FINAL PLAT REVIEW | 05/13/2006 | COMPLETED |
04/18/2006 | ASSURANCES | 05/16/2006 | COMPLETED |
06/19/2006 | ASSURANCES | 07/14/2006 | COMPLETED |
06/23/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 07/25/2006 | COMPLETED |
08/16/2006 | ASSURANCES | 09/14/2006 | COMPLETED |
09/14/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 09/29/2006 | COMPLETED |
09/27/2006 | ASSURANCES | 10/04/2006 | COMPLETED |
10/06/2006 | FINAL PLAT PACKAGE | 10/18/2006 | COMPLETED |