Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Approved
Type:
Land Division
Address:
1510 S 9TH AV

Apply Date:
12/13/2005
Applicant:
Unknown
Description:
BARRIO OCHOA
Architects:
  • City of Tucson DTM Streets and Traffic Maintenance
  • LAWYERS TITLE OF ARIZONA
Contractors:

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/26/2022 SPECIAL INSPECTION - Pima County Sewer (Third Party) Passed {Activity date: 04/26/2022; Status: Approved; Inspector: SharonBeasle; Comment: Entered by SBEASLE1 - Approved. See 3-page document in "Documents" section of PRO, titled :"Pima County Wastewater approval, discharge authorization, date 09.14.2011." Pima Co permit# 56562}
04/28/2022 TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 04/28/2022; Status: Approved; Inspector: RLeigh; Comment: Entered by RLEIGH1 - }
06/07/2022 COT - WATR - Design Plan Construction Passed {Activity date: 06/07/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/10/2022 COT - ENGR - Site - Assurance Release Passed {Activity date: 06/10/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE WAS COMPLETED AS SHOWN ON THE APPROVED PLANS ON 10/14/2021 WHEN IT WAS APPROVED ON PERMIT NUMBER DP21-0016.
WHEN IT WAS INSPECTED ON THIS DATE 6/10/2022 IT WAS NOTED THAT THE PROPERTY OWNER SOUTH OF THE BASIN HAS REMOVED THE NORTHERN BERM OF THE BASIN AND IS IN THE PROCESS OF FILLING THE BASIN WHICH IS NOT ALLOWED. THEY ARE SEEKING TO BUY THE BASIN PARCEL FROM THE TITLE COMPANY,} ; {Activity date: 08/22/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE HAS BEEN COMPLETED BUT NOT PER THE APPROVED PLANS, SEE THE NOTES BELOW FOR WHAT IS NEEDED TO CLOSE OUT THE PROJECT. FOR THE SUBDIVISION TO BE CLOSED OUT FULLY ALL THE INSPECTIONS FOR THIS PERMIT WILL NEED TO BE COMPLETED AND APPROVED FOR THE FINAL CLOSING OF THE SUBDIVISION.

THE SITE HAS BEEN CONSTRFUCTED BUT NOT PER THE APPROVED PLANS TOTALLY IN THE FOLLWOING MANNER:
1) THE PLANS CALL OUT ON NOTE #4 TO CONSTRUCT A 1,100 CU FT RETENTION BASIN AND PLACE ROCK RIP RAP ON FILTER FABRIC. THIS HAS NOT BE CONSTRUCTED AT THIS TIME.
COMPLETE THIS WORK, ALONG WITH GENERAL SITE CLEANUP PRIOR TO SCHEDULING A RE-INSPECTION FOR THIS SITE.} ; {Activity date: 08/16/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SEE THE PREVIOUS COMMENTS FOR THIS SITE, COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS OR PROVIDE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. I WILL DISCUSS ALL CHANGES WITH JOHN VAN WINKLE ON 8/19/19 TO DETERMINE IF ANYTHING WILL NEED TO BE DONE PRIOR TO A FULL RELEASE OF THIS SITE.
} ; {Activity date: 07/10/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ALL OF THE INSPECTIONS NEED TO BE APPROVED FOR THIS SITE TO BE FULLY RELEASED, AND THE GRADING PERMIT FOR THIS SITE WILL NEED TO BE CLOSED OUT. CONTACT JOHN VAN WINKLE OR DAVID ROBERTS IF YOU HAVE ANY QUESTIONS.} ; {Activity date: 06/24/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL OF THE WORK SHOWN ON THE ORIGINAL GRADING PERMIT FOR THE SITE AND HAVE ALL THE ORIGINAL PERMITS CLOSED OUT PRIOR TO SEEKING A FINAL FOR} ; {Activity date: 08/13/2008; Status: Partial Approval; Inspector: JFEMLING; Comment: Entered by JFEMLIN1 - Not ready for full release, complete the following items.
1) asphalt settlement in 9th due to the install of utilities.
2) Provide Eng. Cert for Basin. Sand has been added and volume has changed.
3) Asphalt settlement in driveways and turnarounds.
4) Call for final gradimg inspection for permit # T07BU00258} ; {Activity date: 06/10/2008; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - MET ON-SITE WITH MALENA CARREON TO SEE WHAT WORK HAS BEEN COMPLETED SINCE THE PREVIOUS INSPECTION. THE DEVELOPER HAS MADE THE REPAIRS TO THE DRIVEWAYS AS NEEDED TO ALLOW FOR ACCESS OFF OF 19TH AVENUE. AT THIS TIME WE WILL ALLOW FOR THE RELEASE OF UPTO 75% OF THE LOTS, A FULL RELEASE CAN NOT HAPPEN UNTIL ALL THE RETENTION/DETENTION BASIN IS COMPLETED FULLY AND THE ENGINEER OF RECORD HAS PROVIDED US WITH A LETTER OF CERTIFICATION FOR THE SITE AND ALL COMMON AREAS. I WILL RECHECK THE AREA ONCE I HAVE BEEN ADVISED THAT ALL OF THE REMAINING WORK IS COMPLETE AND READY FOR THE FINAL INSPECTION. I HAVE ADVISED THE DEVELOPER THAT THEY MAY NEED TO ADD ADDITIONAL EROSION PROTECTION IN THE AREAS THAT ARE ADJACENT TO THE DRAINAGE WAYS OR IN CLOSE PROXIMITY TO THE RETENTION/DETENTION BASIN. HE WILL DISCUSS THIS ISSUE WITH THE ENGINEER OF RECORD AND PLACE ALL MATERIALS THAT ARE REQUESTED FROM THE ENGINEER OF RECORD.} ; {Activity date: 05/28/2008; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - DROVE TO THE SITE AND LOOKED AT THE ACCESS TO EACH OF THE UNITS FOR THE FULL RELEASE OF THE SITE ON THE ASSURANCES. IT APPEARS THAT THE SITE IS READY FOR THE RELEASE OF SOME OF THE UNITS AT THIS TIME, OTHERS TO BE RELEASED ONCE ALL OF THE COMMON ITEMS ARE COMPLETE(ROADWAYS, DRAINAGE WAYS, AND UTILITIES. THE SITE ASSURANCES CAN NOT BE RELEASED AT THIS TIME DUE TO THE REMAINING AMOUNT OF WORK THAT STILL NEEDS TO BE COMPLETED. A FULL RELEASE WILL NOT BE ENTERTAINED AT THIS TIME, BUT A PARTIAL RELEASE CAN BE GIVEN ON 2 OF THE 5 LOTS. TO RECEIVE A FULL RELEASE OF THE SITE A COMPLETION BONED WILL NEED TO BE PLACED FOR ALL REMAINING ASSURABLE ITEMS THAT ARE CURRENTLY NOT COMPLETED. IT HAS BEEN NOTED THAT SOME OF THE LOTS HAVE GRADING DIFFERENTIAL PROBLEMS, THESE WERE OT NOTED DURING THE REVIEW PROCESS. WE WILL BE RELEASING THESE LOTS FOR SALE AND WILL NOT BE HOLDING THEM, I HAVE CONSULTED MATTHEW FLICK AND JIM VOGELSBURG PRIOR TO AUTHORIZING THE RELEASE OF THE LOTS.} ; {Activity date: 05/27/2008; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - BORROWED MALENA'S CAMERA AND PHOTOGRAPHED THE SITE, THESE PHOTO'S WILL BE SHARED AND CHECKED BY MATHEW FLICK TO DETERMINE IF THERE IS ANYTHING ON THIS SITE THAT IS NOT CONSTRUCTED CORRECTLY.} ; {Activity date: 05/23/2008; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED ON 5/23/2008 AND NOTED THAT THE ROADWAYS HAD BEEN CONSTRUCTED FOR EACH OF THE UNITS. THERE HAVE BEEN SOME ISSUES NOTED ON-SITE AT THIS TIME THAT MAY NEED TO BE RESOLVED PRIOR TO THE FULL RELEASE OF THE ASSURANCES. ON 5/27/08 I WILL GO BY THE SITE AND TAKE SOME PHOTO'S OF WHAT HAS BEEN CONSTRUCTED, AND WILL COMPARE THESE PHOTO'S TO THE APPROVED SET OF GRADING DRAWINGS FOR THIS SITE. AT THAT TIME I WILL CONFER WITH MATHEW FLICK ABOUT ANY ITEMS THAT APPEAR TO BE OUT OF TOLERANCE. PHOTO'S WILL BE TAKEN OF THE SITE AND PLACED IN THE SILE FOR FUTURE REFERANCE IF NEED BE.
} ; {Activity date: 05/09/2008; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THIS SITE WAS CHECKED FOR THE INITIAL RELEASE OF THE ASSURANCES AND HAS BEEN FOUND TO BE INCOMPLETE AT THIST TIME. THIS SITE WILL NOT BE CONSIDERED FOR THE INITIAL RELEASE UNTIL THE ROADWAY AREAS AND PUBLIC ACCESS POINT HAVE BEEN CONSTRUCTED. CURRENTLY ALL ROADWAYS ARE UNDER GOING CONSTRUCTION AND ARE NOT ANTICIPATED TO BE COMPLETE UNTIL AROUND 5/14/2008. THIS SITE WILL BE RECHECKED NEXT WEEK TO VERIFY THE STATUS OF THIS PHASE OF CONSTRUCTION, AND WILL BE NOTED IN PERMITS PLUS AT THAT TIME.}

Plan Reviews

Plan Number - S05-246
Plan Status: Approved
Plan Description: BARRIO OCHOA
Start Date Submittal Complete Date Status  
01/10/2007 FINAL PLAT PACKAGE 03/01/2007 COMPLETED Review Details
03/01/2007 FINAL PLAT PACKAGE 04/25/2007 COMPLETED Review Details
03/01/2007 ASSURANCES 04/25/2007 COMPLETED Review Details
03/22/2006 RESUBMITTAL - MINOR SUBD REVIEW 05/06/2006 COMPLETED Review Details
08/01/2006 RESUBMITTAL - MINOR SUBD REVIEW 09/22/2006 COMPLETED Review Details
10/05/2006 RESUBMITTAL - MINOR SUBD REVIEW 12/01/2006 COMPLETED Review Details
12/14/2005 MINOR SUBDIVISION REVIEW 02/08/2006 COMPLETED Review Details

Documents

File Name Document Type  
S05-246, FULL RELEASE OF ALL LOTS AND COMMON AREAS.PDF ASSURANCES VIEW
S05-246 ASSURANCE RELEASE LOG.XLS ASSURANCES VIEW
S05-246, PARTIAL RELEASE, LOT 1, RECORDED ON 08.11.2008.PDF ASSURANCES VIEW
ORIGINAL ASSURANCE AGREEMENT, RECORDED ON 05.18.2007.PDF ASSURANCES VIEW
PIMA COUNTY WASTEWATER APPROVAL, DISCHARGE AUTHORIZATION, DATE 09.14.2011.PDF ASSURANCES VIEW