Plan Details

Status:
Approved
Type:
Land Division
Address:
8820 E 21ST ST

Apply Date:
11/16/2005
Applicant:
Unknown
Description:
CAMINO SECO VILLAGE
Architects:
  • ALLIANCE BANK OF AZ
  • City of Tucson DTM Streets and Traffic Maintenance
  • FIDELITY NATIONAL TITLE AGENCY
  • WARREN.THOMPSON
Contractors:

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/23/2021 COT - ENGR - Site - Assurance Release Partial Pass {Activity date: 06/23/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - OK TO RELEASE LOTS 1 AND 2} ; {Activity date: 06/17/2021; Status: Partial Approval; Inspector: DRBOBERTS; Comment: Entered by DROBERT5 - Ok, for individual lots at this time but not for the Full and Final Release of all Lots, Blocks, and Common Areas.} ; {Activity date: 07/10/2020; Status: Partial Approval; Inspector: DRBOBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/13/2018; Status: Partial Approval; Inspector: DRBOBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/27/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS. IN THE WEST BASIN THE ACCESS CABLE HAS BEEN INSTALLED BUT THE POST ARE NOT STABLE IN THE GROUND, REMOVE ALL LOOSE POST AND REPOUR FOOTINGS FOR THE NEW POST AS PER OUR DETAILS.
2) THE EAST BASIN IS MISSING THE EAST WALL AND NEEDS TO HAVE IT COMPLETED. VERIFY THAT ALL THE POST HAVE BEEN INSTALLED CORRECTLY AND THEN INSTALL THE CABLE TO PREVENT VEHICLE ACCESS.} ; {Activity date: 05/18/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I WALKED THIS SITE TO SEE IF IT IS REAFY FOR THE FULL RELEASE OF THE ASSURANCES, IT IS NOT COMPLETE AT THIS TIME. THE FOLLOWING ITEMS WILL NEED TO BE FULL LOOKED AT PRIOR TO THIS SITE BEING FUKLLY RELEASED:
1) THE APPROVED TENTATIVE PLAT SHOWS THAT THE TWO BASINS ARE TO HAVE ACCESS GATES INSTALLED AT THE ENTRANCES ON THE ENDS ADJACENT TO 22ND STREET. ON THE WESTERN BASINS POST HAVE BEEN POURED AT THE ENTRANCE AND CABLE HAS BEEN STRUNG BETWEET THE POST. AT THIS LOCATION THE WESTERN MOST POST IS LOOSE IN THE SET AND CAN BE REMOVED OR PULLED OVER WITH LITTLE EFFORT. THIS POST AND MAYBE OTHERS WILL NEED TO HAVE THE FOUNDATIONS POURED AGAIN SO THAT THEY ARE SECURE AND STABLE.
2) ON THE SOUTH END OF THE EASTERN BASIN THE POST HAVE BEEN THE FOUDATIONS POURED, BUT THERE ARE NO CABLES PROVIDED TO PREVENT ACCESS INTO THE BASIN, ALSO THE EASTERN WALL OF THE BASIN HAS NOT BEE INSTALLED AT THIS TIME. COMPLETE ALL EXTERIOR WALLS FOR THIS BASIN.
3) THE FULL SITE WILL NEED TO HAVE A FULL INSPECTION TO ENSURE THAT THERE HAVE BEEN NO CHANGES MADE THAT ARE NOT REFLECTED ON THE APPROVED PLANS.
4) THE LANDSCAPE ON THIS SITE WILL NEED TO BE LOOKED AT SINCE SOME OF THE NPPO PLANTS HAVE EITHER BEEN DESTROYED, DIED, OR HAVE BEEN STOLEN DURING THE DELAY IN THE START OF THE PROJECT. A REVISED APPROVED DRAWINGS NEED TO BE PROVIDED FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO SOME OF THE PLANTS AND THE TREES APPEAR TO HAVE DIED SINCE THEY WERE ORIGINALLY INSTALLED, VERIFICATION OF THE A WORKING IRRIGATION WILL BE NEED PRIOR TO THE FULL APPROVAL OF THIS SITE.} ; {Activity date: 11/09/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE RELEASE OF LOTS AT THIS TIME.}

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/06/2016 COT - WATR - Design Plan Construction Passed {Activity date: 07/06/2016; Status: Approved; Inspector: PB; Comment: Entered by PBAUGHM1 - }
08/23/2016 SPECIAL INSPECTION - Pima County Sewer (Third Party) Passed {Activity date: 08/23/2016; Status: Approved; Inspector: PB; Comment: Entered by PBAUGHM1 - Approval Letter is in SIRE.}
09/15/2016 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 09/15/2016; Status: Approved; Inspector: PB; Comment: Entered by PBAUGHM1 - Approval letter in Sire}

Plan Reviews

Plan Number - S05-211
Plan Status: Approved
Plan Description: CAMINO SECO VILLAGE
Start Date Submittal Complete Date Status  
02/07/2008 ASSURANCES 02/15/2008 COMPLETED Review Details
02/07/2008 FINAL PLAT PACKAGE 03/19/2008 COMPLETED Review Details
02/09/2007 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 03/13/2007 COMPLETED Review Details
04/23/2008 ASSURANCES 04/30/2008 COMPLETED Review Details
04/23/2008 FINAL PLAT PACKAGE 05/30/2008 COMPLETED Review Details
05/18/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 08/01/2016 COMPLETED Review Details
05/23/2007 FINAL PLAT REVIEW 07/16/2007 COMPLETED Review Details
06/27/2006 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 08/29/2006 COMPLETED Review Details
08/01/2016 REVISION - TENT PLAT & CORE RESUB 08/18/2016 COMPLETED Review Details
08/18/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 08/18/2016 COMPLETED Review Details
09/09/2015 REVISION - TENT PLAT & CORE RESUB 10/14/2015 COMPLETED Review Details
09/17/2007 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 10/18/2007 COMPLETED Review Details
09/18/2007 ASSURANCES 11/13/2007 COMPLETED Review Details
10/15/2015 REVISION - TENT PLAT & CORE RESUB 12/15/2015 COMPLETED Review Details
11/14/2007 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 12/07/2007 COMPLETED Review Details
12/01/2006 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 01/19/2007 COMPLETED Review Details
12/14/2007 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 12/21/2007 COMPLETED Review Details