Plan: S05-092
Plan Details
Apply Date:
06/07/2005
Applicant:
BAKER AND ASSOCIATES
Description:
SUBC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2006 | ASSURANCE - PC WASTEWATER | SRAVAL | Approved | SEE SIRE |
| 12/14/2007 | ASSURANCE - DSD | DROBERTS | Approved | THE SITE WAS PREVIOUSLY INSPECTED ON 10/02/2007 FOR THE INITIAL RELEASE OF ALL UNITS, AND AND THE FOLLOWING ITEMS WERE NOTED WRONG AT THAT TIME. THE FOLLOWING UNITS ARE CURRENTLY UNDER CONSTRUCTION: 153, 155, 156, 163, 169, 170, AND 172. ALL RELEASES PAST THE INITIAL 75% WILL REQUIRE A COMPLETION BOND FOR ALL REMAINING ASSURABLE ITEMS. THE FOLLOWING ITEMS HAVE BEEN FOUND TO BE INCOMPLETE AT THIS TIME: 1) ALL SIDEWALKS & DRIVEWAYS HAVE NOT BEEN INSTALLED OR CONSTRUCTED ON THIS SITE AT THIS TIME. A COMPLETION BOND WILL BE REQUIRED FOR ALL REMAINING ASSURABLE ITEMS PRIOR TO THE FINAL RELEASE, PLEASE NOTE ALL LOCATIONS AND QUANTITIES IN THE ACCOMPANING DOCUMENTATION FOR THE BOND. 2) COMPLETE ALL SLOPE GRADING AND DRAINAGE STRUCTURES ALONG THE EAST SIDE OF THIS PROJECT, AND PROVIDE AS-BUILT DRAWINGS FOR ANY CHANGES. 3) COMPLETE ALL PIA WORK ASSOCIATED WITH THIS PROJECT ON 22ND STREET. 4) REPAIR ALL DAMAGED PAVEMENT, SETTLED WATER VALVES AND SURVEY MONUMENTS AS NEEDED. 5) PROVIDE A LETTER OF CERTIFICATION FOR ALL DRAINAGE ITEMS WITHIN THE PROJECT LIMITS. THIS IS NOT TO BE CONSIDERED A FULL AND COMPLETE PUNCHLIST UNTIL THE BOND QUANTITIES HAVE BEEN SUBMITTED AND CHECKED. |
| 04/14/2009 | ASSURANCE - DOT TRAFFIC | THARVISON | Approved | SEE SIRE |
| 05/14/2009 | ASSURANCE - UTILITY SERVICES | LHERNAND | Approved | SEE SIRE |
| 05/19/2009 | ASSURANCE - DOT PERMITS & CODE | MGEWEKE | Approved | SEE SIRE |
Plan Reviews
Plan Number - S05-092
Plan Status: Final
Plan Description: SUBC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/07/2005 | FINAL PLAT REVIEW | 07/19/2005 | COMPLETED |
| 09/13/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 09/30/2005 | COMPLETED |
| 09/30/2005 | ASSURANCES | 01/04/2006 | COMPLETED |
| 12/07/2005 | FINAL PLAT PACKAGE | 01/24/2006 | COMPLETED |