Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Approved
Type:
Land Division
Apply Date:
01/11/2005
Applicant:
N/A
Description:
TIERRA VISTA PHASE III

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/30/2005 SPECIAL INSPECTION - Pima County Sewer (Third Party) Partial Pass {Activity date: 03/29/2005; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - G-2004-021 PHASE 3 LOTS 12-25, 52-98, 286-298, 310-339, 344-371} ; {Activity date: 11/30/2005; Status: Partial Approval; Inspector: SRAVAL; Comment: Entered by THAUSER1 - APPROVAL FOR PHASE IV LOTS 1-11, 26-51, 340-343}

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/06/2006 COT - WATR - Design Plan Construction Passed {Activity date: 03/06/2006; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - 2-036-064-2005}
01/22/2008 TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 01/16/2008; Status: Denied; Inspector: TSTOCKET; Comment: Entered by SMONTIE1 - PLAN NO. : I-2005-024

On January 16, 2008, Traffic Engineering inspected the project that you proposed for acceptance. The following items need to be addressed before we can forward our recommendation for your project's acceptance.

The following street name signs have the wrong block numbers or missing avenue that need to be corrected:

* Sunrise Valley Drive has 3850E, but should be 6400S, and Bright View Street has 6450S, but should be 3800E.

* Bright Sun Avenue has 3700E, but should be 6400S and missing "Avenue".

* Bright View Street has 6450S, but should be 3700E.

All of the corrections/ additions can be made by covering the incorrect information with stickers containing the corrected information.

Please complete these requests, as soon as possible, so that we may release your Traffic Engineering obligation and forward our recommendation for your project's acceptance.} ; {Activity date: 01/22/2008; Status: Approved; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - I-2005-024} ; {Activity date: 05/07/2007; Status: Denied; Inspector: TSTOCKET; Comment: Entered by ASHOFFS1 - I-2005-024

The following two sets of street name signs have the wrong block numbers that need to be corrected:

" Desert Walk Lane has 6450S, but should be 3800E and Bright View Street has 6450S, but should be 3800E.

" Sunrise Valley Drive has 3850E, but should be 6400S and Bright View Street has 6450S, but should be 3800E.

The following set of street name signs has the wrong block numbers and is missing "Avenue":

" Bright Sun Avenue has 3700E, but should be 6400S and is missing "Avenue."

" Bright View Street has 6450S, but should be 3700E.

Please complete these requests, as soon as possible, so that we may release your Traffic Engineering obligation and forward our recommendation for your project's acceptance.
}
09/05/2008 COT - ENGR - Site - Assurance Release Passed {Activity date: 09/05/2008; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT2 - } ; {Activity date: 05/23/2007; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE FINAL RELEASE OF THE ASSURANCES AND THE FOLLOWING ITEMS HAVE BEEN FOUND TO BE INCOMPLETE AT THIS TIME.
1) REPAIR ALL SIDEWALKS AND WHEELCHAIR ACCESS RAMPS AS NEEDED THROUGHOUT THE SITE.
2) CHECK ALL BASINS AND DRAINAGE WAYS FOR SIGNS OF EROSION AND SEDIMENT BUILD-UP, REPAIR AS NEEDED.} ; {Activity date: 09/28/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED AND THE FOLLOWING ITEMS WERE FOUND TO BE COMPLETE AT THIS TIME: CURBS, ROADWAYS, AND UTILITIES. SIDEWALKS AND DRIVEWAYS ARE COMPLETE ON ALL BUT 13 LOTS AT THIS TIME.
1) A COMPLETION BOND IS REQUIRED FOR ALL REMAINING SIDEWALKS AND DRIVEWAYS.
2) GENERAL CLEANUP OF THE SITE IS REQUIRED PRIOR TO CALLING IN A FINAL GRADING INSPECTION AND THE RELEASE OF THIS SITES ASSURANCES AND BONDS.
3) A BASIN CERTIFICATION LETTER IS REQUIRED FOR ALL DRAINAGE WAYS AND BASINS LOCATED WITHIN THE PROJECT LIMITS.
4) MAKE THE NECESSARY REPAIRS TO THE DRAINAGE OUTLET STRUCTURE AT THE SOUTHWEST CORNER OF THIS SITE, OR PROVIDE ADDITIONAL MONEY IN THE COMPLETION BOND TO COVER THIS ITEM.
I HAVE INCLUDED THE ITEMS NOTED ON THE LATEST FINAL GRADING INSPECTION FOR THIS SITE, THESE ITEMS ALSO HAVE TO BE ADDRESSED PRIOR TO THE RELEASE OF ALL BONDS AND ASSURANCES.
Met on site with Nicky with K.B. Home and thier engineer and the super from O'Leary. Discussed repairs to the concrete ramp on the southwest corner of the project. Erosion removing material from under pad. I explained to all that any changes need to be approved by Elizabeth city engineer first.} ; {Activity date: 02/15/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED AND THE FOLLOWING ITEMS WERE FOUND TO BE COMPLETE AT THIS TIME: CURBS, ROADWAYS, AND UTILITIES. SIDEWALKS AND DRIVEWAYS ARE COMPLETE FOR THE FOLLOWING LOTS 34-37, 39-42, 44-52, 340, 341, AND 344. 1) ALL OTHER LOTS WILL REQUIRE A COMPLETION BOND PRIOR TO A FINAL RELEASE OF THE ASSURANCES. 2) ALSO NOT COMPLETE AT THIS TIME IS COMMON AREA "A" LOCATED BETWEEN LOTS #25 AND #26, THE DRAINWAY HAS BEEN CUT BUT THE STRUCTURE HAS NOT BEEN CONSTRUCTED. 3) GENERAL CLEANUP OF THE SITE IS REQUIRED PRIOR TO CALLING IN A FINAL INSPECTION FOR THE RELEASE OF THIS SITES BONDS. 4) BASIN CERTIFICATION LETTER REQUIRED FOR ALL DRAINAGE WAYS ND BASINS.} ; {Activity date: 11/14/2005; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by TACHONG1 - THIS SITE WAS CHECKED TO ENSURE THAT ALL REQUIREMENTS FOR THE INITIAL RELEASE HAVE BEEN COMPLETED. THE ROADWAYS, CURBS, UTILITIES, AND ALL BASINS. THE SITE CAN BE RELEASE AT THIS TIME UP TO 75% WITHOUT ANY ADDITIONAL INSPECTIONS. A LETTER OF CERTIFICATION WILL BE REQUIRED FOR ALL DRAINIAGE WAYS PRIOR TO THE RELEASE OF ALL ASSURANCES.}

Plan Reviews

Plan Number - S05-005
Plan Status: Approved
Plan Description: TIERRA VISTA PHASE III
Start Date Submittal Complete Date Status  
01/12/2005 TENTATIVE PLAT REVIEW 02/23/2005 COMPLETED Review Details
03/01/2005 FINAL PLAT REVIEW 04/28/2005 COMPLETED Review Details
03/28/2005 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 04/28/2005 COMPLETED Review Details
05/04/2005 ASSURANCES 06/02/2005 COMPLETED Review Details
05/26/2005 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 06/08/2005 COMPLETED Review Details
06/09/2005 FINAL PLAT PACKAGE 07/05/2005 COMPLETED Review Details

Documents

File Name Document Type  
FINAL_01.TIFF PLATS VIEW
FINAL_02.TIFF PLATS VIEW
MP-60-006_001.TIF PLATS VIEW
MP-60-006_002.TIF PLATS VIEW
TENTATIVE_01.TIF PLATS VIEW
TENTATIVE_02.TIF PLATS VIEW
TENTATIVE_03.TIF PLATS VIEW
TENTATIVE_04.TIF PLATS VIEW
TENTATIVE_05.TIF PLATS VIEW
TENTATIVE_06.TIF PLATS VIEW
TENTATIVE_07.TIF PLATS VIEW
TENTATIVE_08.TIF PLATS VIEW
TENTATIVE_09.TIF PLATS VIEW
LANDSCAPE_COVER.TIF PLATS VIEW
LANDSCAPE_01.TIF PLATS VIEW
LANDSCAPE_02.TIF PLATS VIEW
LANDSCAPE_03.TIF PLATS VIEW
LANDSCAPE_04.TIF PLATS VIEW
LANDSCAPE_05.TIF PLATS VIEW
LANDSCAPE_06.TIF PLATS VIEW
LANDSCAPE_07.TIF PLATS VIEW
LANDSCAPE_08.TIF PLATS VIEW
LANDSCAPE_09.TIF PLATS VIEW
NPP_01.TIF PLATS VIEW
NPP_02.TIF PLATS VIEW
NPP_03.TIF PLATS VIEW
NPP_04.TIF PLATS VIEW
NPP_IRRIGATION_01.TIF PLATS VIEW
NPP_IRRIGATION_02.TIF PLATS VIEW
NPP_IRRIGATION_03.TIF PLATS VIEW
NPP_IRRIGATION_04.TIF PLATS VIEW
NPP_IRRIGATION_05.TIF PLATS VIEW
NPP_IRRIGATION_06.TIF PLATS VIEW
NPP_IRRIGATION_07.TIF PLATS VIEW
NPP_IRRIGATION_08.TIF PLATS VIEW
ZONING_REVIEW.XLS PLATS VIEW
ZONING_REVIEW1.TIF PLATS VIEW
ZONING_REVIEW2.TIF PLATS VIEW