Plan: S05-005
Plan Details
Apply Date:
01/11/2005
Applicant:
N/A
Description:
TIERRA VISTA PHASE III
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2005 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Partial Pass | {Activity date: 03/29/2005; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - G-2004-021 PHASE 3 LOTS 12-25, 52-98, 286-298, 310-339, 344-371} ; {Activity date: 11/30/2005; Status: Partial Approval; Inspector: SRAVAL; Comment: Entered by THAUSER1 - APPROVAL FOR PHASE IV LOTS 1-11, 26-51, 340-343} |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/06/2006 | COT - WATR - Design Plan Construction | Passed | {Activity date: 03/06/2006; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - 2-036-064-2005} | |
01/22/2008 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 01/16/2008; Status: Denied; Inspector: TSTOCKET; Comment: Entered by SMONTIE1 - PLAN NO. : I-2005-024 On January 16, 2008, Traffic Engineering inspected the project that you proposed for acceptance. The following items need to be addressed before we can forward our recommendation for your project's acceptance. The following street name signs have the wrong block numbers or missing avenue that need to be corrected: * Sunrise Valley Drive has 3850E, but should be 6400S, and Bright View Street has 6450S, but should be 3800E. * Bright Sun Avenue has 3700E, but should be 6400S and missing "Avenue". * Bright View Street has 6450S, but should be 3700E. All of the corrections/ additions can be made by covering the incorrect information with stickers containing the corrected information. Please complete these requests, as soon as possible, so that we may release your Traffic Engineering obligation and forward our recommendation for your project's acceptance.} ; {Activity date: 01/22/2008; Status: Approved; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - I-2005-024} ; {Activity date: 05/07/2007; Status: Denied; Inspector: TSTOCKET; Comment: Entered by ASHOFFS1 - I-2005-024 The following two sets of street name signs have the wrong block numbers that need to be corrected: " Desert Walk Lane has 6450S, but should be 3800E and Bright View Street has 6450S, but should be 3800E. " Sunrise Valley Drive has 3850E, but should be 6400S and Bright View Street has 6450S, but should be 3800E. The following set of street name signs has the wrong block numbers and is missing "Avenue": " Bright Sun Avenue has 3700E, but should be 6400S and is missing "Avenue." " Bright View Street has 6450S, but should be 3700E. Please complete these requests, as soon as possible, so that we may release your Traffic Engineering obligation and forward our recommendation for your project's acceptance. } |
|
09/05/2008 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 09/05/2008; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT2 - } ; {Activity date: 05/23/2007; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE FINAL RELEASE OF THE ASSURANCES AND THE FOLLOWING ITEMS HAVE BEEN FOUND TO BE INCOMPLETE AT THIS TIME. 1) REPAIR ALL SIDEWALKS AND WHEELCHAIR ACCESS RAMPS AS NEEDED THROUGHOUT THE SITE. 2) CHECK ALL BASINS AND DRAINAGE WAYS FOR SIGNS OF EROSION AND SEDIMENT BUILD-UP, REPAIR AS NEEDED.} ; {Activity date: 09/28/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED AND THE FOLLOWING ITEMS WERE FOUND TO BE COMPLETE AT THIS TIME: CURBS, ROADWAYS, AND UTILITIES. SIDEWALKS AND DRIVEWAYS ARE COMPLETE ON ALL BUT 13 LOTS AT THIS TIME. 1) A COMPLETION BOND IS REQUIRED FOR ALL REMAINING SIDEWALKS AND DRIVEWAYS. 2) GENERAL CLEANUP OF THE SITE IS REQUIRED PRIOR TO CALLING IN A FINAL GRADING INSPECTION AND THE RELEASE OF THIS SITES ASSURANCES AND BONDS. 3) A BASIN CERTIFICATION LETTER IS REQUIRED FOR ALL DRAINAGE WAYS AND BASINS LOCATED WITHIN THE PROJECT LIMITS. 4) MAKE THE NECESSARY REPAIRS TO THE DRAINAGE OUTLET STRUCTURE AT THE SOUTHWEST CORNER OF THIS SITE, OR PROVIDE ADDITIONAL MONEY IN THE COMPLETION BOND TO COVER THIS ITEM. I HAVE INCLUDED THE ITEMS NOTED ON THE LATEST FINAL GRADING INSPECTION FOR THIS SITE, THESE ITEMS ALSO HAVE TO BE ADDRESSED PRIOR TO THE RELEASE OF ALL BONDS AND ASSURANCES. Met on site with Nicky with K.B. Home and thier engineer and the super from O'Leary. Discussed repairs to the concrete ramp on the southwest corner of the project. Erosion removing material from under pad. I explained to all that any changes need to be approved by Elizabeth city engineer first.} ; {Activity date: 02/15/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED AND THE FOLLOWING ITEMS WERE FOUND TO BE COMPLETE AT THIS TIME: CURBS, ROADWAYS, AND UTILITIES. SIDEWALKS AND DRIVEWAYS ARE COMPLETE FOR THE FOLLOWING LOTS 34-37, 39-42, 44-52, 340, 341, AND 344. 1) ALL OTHER LOTS WILL REQUIRE A COMPLETION BOND PRIOR TO A FINAL RELEASE OF THE ASSURANCES. 2) ALSO NOT COMPLETE AT THIS TIME IS COMMON AREA "A" LOCATED BETWEEN LOTS #25 AND #26, THE DRAINWAY HAS BEEN CUT BUT THE STRUCTURE HAS NOT BEEN CONSTRUCTED. 3) GENERAL CLEANUP OF THE SITE IS REQUIRED PRIOR TO CALLING IN A FINAL INSPECTION FOR THE RELEASE OF THIS SITES BONDS. 4) BASIN CERTIFICATION LETTER REQUIRED FOR ALL DRAINAGE WAYS ND BASINS.} ; {Activity date: 11/14/2005; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by TACHONG1 - THIS SITE WAS CHECKED TO ENSURE THAT ALL REQUIREMENTS FOR THE INITIAL RELEASE HAVE BEEN COMPLETED. THE ROADWAYS, CURBS, UTILITIES, AND ALL BASINS. THE SITE CAN BE RELEASE AT THIS TIME UP TO 75% WITHOUT ANY ADDITIONAL INSPECTIONS. A LETTER OF CERTIFICATION WILL BE REQUIRED FOR ALL DRAINIAGE WAYS PRIOR TO THE RELEASE OF ALL ASSURANCES.} |
Plan Reviews
Plan Number - S05-005
Plan Status: Approved
Plan Description: TIERRA VISTA PHASE III
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/12/2005 | TENTATIVE PLAT REVIEW | 02/23/2005 | COMPLETED |
03/01/2005 | FINAL PLAT REVIEW | 04/28/2005 | COMPLETED |
03/28/2005 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 04/28/2005 | COMPLETED |
05/04/2005 | ASSURANCES | 06/02/2005 | COMPLETED |
05/26/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 06/08/2005 | COMPLETED |
06/09/2005 | FINAL PLAT PACKAGE | 07/05/2005 | COMPLETED |