Plan: S05-003
Plan Details
Apply Date:
01/10/2005
Applicant:
Shawn
Description:
CIVANO NORTH RIDGE
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- FIRST AMERICAN TITLE INSURANCE CO
- PEPPER VINER AT CIVANO NORTH RIDGE LLC
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2007 | COT - WATR - Design Plan Construction | Passed | {Activity date: 06/12/2007; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - APPROVAL FOR PHASE II LOTS 26-79 (NOTE- THERE IS NO LOT 33)} ; {Activity date: 06/12/2007; Status: Partial Approval; Inspector: LHERNAND; Comment: Entered by THAUSER1 - APPROVAL FOR PHASE I LOT 1-25} | |
08/13/2007 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 08/13/2007; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - } | |
02/23/2015 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 02/23/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/06/2014; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THROUGH PORTION OF THE SITE INSPECTING THE AREAS FOR FINAL GRADING. ONLY NOTED SOME GENERAL CLEANUP OF THE SITE AND ONE SECTION OF SIDEWALK THAT MAY NEED TO BE REPLACED.} ; {Activity date: 06/21/2013; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE TO SEE HOW THINGS ARE LOOKING AS NOTED ON THE APPROVED TENTATIVE AND FINAL PLATS. THE BIGGEST ITEM FOR THE DEVELOPER IS THE INSTALLATION AND REPLACEMENT OF MISSING AND DAMAGED PLANTS FROM THE ORIGINAL PLAN. NONE OF THE LANDSCAPING HAS BEEN ACCEPTED SINCE THE ORIGINAL PLANT PERIOD, SO THE ONE YEAR GUARANTEE HAS NEVER BEEN PLACED INTO EFFECT.} ; {Activity date: 06/24/2013; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTACTED MIKE WHYDE WITH PEPPERVINER AND ADVISED HIM THAT THE FOLLOWING ITEMS NEED TO BE ADDRESSED: WALKED THE SITE TOO SEE WHAT TYPE OF WORK IS NEEDED FOR THIS SITE TO COMPLETE THE WORK AS SHOWN ON THE APPROVED PLANS. CURRENTLY THE ITEMS THAT STAND OUT AT THIS TIME IS: MINOR CLEANUP OF THE SITE, COMPLETE ALL SIDEWALKS AND DRIVEWAYS, REPLACE ALL MISSING OR DEAD LANDSCAPE ITEMS, REMOVE ALL UNNEEDED STORMWATER CONTROL ITEMS. PART OF THESE ITEMS WILL BE ADDRESSED BY THE CONTRACTOR AS NEEDED, HE WILL NEED TO ADDRESS THE REPLACEMENT OF THE MISSING OR DAMAGED PLANTS FROM THIS SITE.} ; {Activity date: 05/23/2013; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE WORK CONTINUES ON THE HOUSES BUT THE GENERAL SITE CONDITION IS STILL NOT READY TO BE APPROVED. I STILL HAVE NOT HEARD FROM THE HOA IN REGARDS TO THE CONCERNS THAT THEY HAVE WITH INCOMPLETE WORK AT THIS TIME.} ; {Activity date: 03/28/2013; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH MEBERS OF THE COMMUNITY TO LOOK OVER SOME OF THE CONCERNS THAT THEY HAVE ABOUT THE AREA. THEY WILL FORWARD ME A LIST OF ITEMS THAT THEY FEEL HAVE NOT BEEN ADDRESSED BY THE DEVELOPER.} ; {Activity date: 03/20/2013; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE SITE BUT AND UNABLE TO RELEASE AT THIS TIME. THIS SITE WILL NEED TO BE CHECKED BY THE CITY OF TUCSON PERMITS AND CODE SECTION AS WELL AS THE TRANSPORTATION TRAFFIC SECTION.THERE HAVE BEEN ITEMS NOTED ONSITE THAT MAY NEED TO BE REPAIRED, AND AREAS OF CLEANING AROUND THE DRAINAGE INLET STRUCTURES. ALSO ON THIS SIT THE STORMWATER CONTROLS THAT WERE PLACED DURING CONSTRUCTION NEED TO BE REMOVED PRIOR TO CLOSING THE FINAL GRADING PERMIT.} ; {Activity date: 09/26/2008; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by THAUSER1 - OKAY FOR THE INITIAL RELEASE OF LOTS.} ; {Activity date: 09/15/2008; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} |
|
03/05/2015 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 03/05/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - APPROVED PER THE LETTER FROM RICHARD LEIGH DATED 10/8/2014 LOCATED IN SIRE.} ; {Activity date: 10/13/2008; Status: Denied; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - I-2004-029 PHASES 1, 2, AND 3 ON OCTOBER 13, 2008, TRAFFICE ENGINEERING INSPECTED THE PROJECT THAT YOU PROPOSED FOR ACCEPTANCE. THE FOLLOWING ITEMS NEED TO BE ADDRESSED BEFORE WE CAN FORWARD OUR RECOMMENDATION FOR YOUR PROJECT'S ACCEPTANCE. 1) THE "NO PARKING-FIRE ACCESS" SIGN AND TEL-SPAR SQUARE TUBE POST WITH A CONCRETE FOUNDATION IS MISSING FROM THE PROPERTY LINE OF LOTS 62 AND 63 AND NEEDS TO BE INSTALLED.} |
Plan Reviews
Plan Number - S05-003
Plan Status: Approved
Plan Description: CIVANO NORTH RIDGE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/10/2005 | TENTATIVE PLAT REVIEW | 02/17/2005 | COMPLETED |
02/07/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 02/10/2006 | COMPLETED |
02/07/2006 | ASSURANCES | 02/09/2006 | COMPLETED |
02/17/2005 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 03/08/2005 | COMPLETED |
02/27/2006 | FINAL PLAT PACKAGE | 02/27/2006 | COMPLETED |
11/17/2005 | FINAL PLAT REVIEW | 02/07/2006 | COMPLETED |
12/01/2006 | REVISION - TENTATIVE PLAT REVIEW | 01/19/2007 | COMPLETED |