Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
Final
Type:
SUBDPLAT
Apply Date:
09/18/2003
Applicant:
N/A
Description:
SUBC

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/07/2006 ASSURANCE - PC WASTEWATER SRAVAL Approved G-2003-148
02/09/2006 ASSURANCE - UTILITY SERVICES LHERNAND Approved 2-119-180-2004

LOTS 44-121
02/09/2006 ASSURANCE - UTILITY SERVICES LHERNAND Approved 2-118-179-2004

LOTS 1-43
07/14/2006 ASSURANCE - DOT TRAFFIC TSTOCKET Approved I-2004-070

PHASE II
07/14/2006 ASSURANCE - DOT TRAFFIC TSTOCKET Approved I-2004-036

PHASE I
11/27/2007 ASSURANCE - DSD DROBERTS Approved THE SITE WAS CHECKED FOR THE FINAL RELEASE OF THE ASSURANCES AND HAS BEEN FOUND TO BE INCOMPLETE AT THIS TIME FOR THE FOLLOWING REASONS.
1) THE FOLLOWING LOTS HAVE NOT BEEN WORKED ON AND WILL NEED TO HAVE A COMPLETION BOND ACCEPTED FOR ALL REMAINING ASSURABLE ITEMS: LOTS 1 - 40, 46 - 49, 51 - 53, 56 - 61, 78, 83, 84, 109, AND 113. THE REMAINING OPEN LOT COUNT FOR THIS SITE IS 58 OUT OF 121, 52% OF THE SITE HAS BEEN COMPLETED AT THIS TIME.
2) PREPARE A DATA SHEET LISTING ALL ASSURABLE ITEMS THAT HAVE NOT BEEN COMPLETED, NOTING THE QUANTITY AND LOCATIONS FOR VERIFICATION BY OUR FIELD PERSONNEL. THIS LIST SHOULD BE DETAILED ENOUGH TO SHOW THE SQUARE FOOTAGE OF SIDEWALKS, DRIVEWAYS, NUMBER OF SIGNS OR SURVEY MONUMENTS STILL NEEDED, AND A LIST OF ANY REMAINING DRAINAGE ITEMS THAT HAVE NOT BEEN COMPLETED.
3) ALL OF THE BASINS AND DRAINAGEWAYS ON THIS SITE HAVE SIGNS OF POOR PERCOLATION RATES, AND HAVE BEEN KNOWN TO RETAIN WATER IN EXCESS OF 48 HOURS. A DRAINAGE STATEMENT FROM THE ENGINEER OF RECORD IS REQUIRED FOR ALL DRAINAGE ITEMS LOCATED WITHIN THE PROJECT LIMITS. REMOVE ALL SEDIMENT FROM THE BASINS AND DRAINAGEWAYS AS NEEDED TO ENSURE THAT THE PERCOLATION RATES RETURN BACK TO WITHIN THE TOLERANCES OF THE PIMA COUNTY/CITY OF TUCSON RETENTION DETENTION MANUAL. PER THIS MANUAL THE BASINS WITHIN THIS SITE SHOULD DRAIN WITHIN A 24 HOUR PERIOD.
4) PROVIDE A SET OF AS-BUILT DRAWINGS FOR ANY AND ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE, THAT ARE NOT SHOWN ON ALREADY APPROVED PLANS.

THIS IS NOT TO BE CONSIDERED A FULL AND FINAL PUNCHLIST OF INCOMPLETE ITEMS UNTIL ALL REQUESTED DOCUMENTATION HAS BEEN PROVIDED. A COMPLETE PUNCHLIST WILL BE PROVIDED ONCE ALL OF THE CALCULATIONS HAVE BEEN FIELD CHECKED TO VERIFY WHAT ITEMS STILL REMAIN, AND IF THERE ARE ANY OTHER REQUIREMENTS REQUESTED BY OTHER DEPARTMENTS. CONTACT DAVID ROBERTS TO ARRANGE FOR AN ON-SITE MEETING TO DISCUSS WHAT IS NEEDED IF IT IS NOT CLEAR AT THIS TIME, HE CAN BE REACHED AT 349-7643.
10/02/2017 ASSURANCE - DOT PERMITS & CODE pyg Approved Everything released in 2012

Plan Reviews

Plan Number - S03-026
Plan Status: Final
Plan Description: SUBC
Start Date Submittal Complete Date Status  
01/26/2004 RESUBMITTAL - TENTATIVE PLAT REVIEW 02/13/2004 COMPLETED Review Details
02/20/2004 RESUBMITTAL - TENTATIVE PLAT REVIEW 03/04/2004 COMPLETED Review Details
03/01/2004 FINAL PLAT REVIEW 03/29/2004 COMPLETED Review Details
03/01/2004 ASSURANCES 04/19/2004 COMPLETED Review Details
04/19/2004 RESUBMITTAL - FINAL PLAT REVIEW 05/05/2004 COMPLETED Review Details
04/19/2004 ASSURANCES 05/24/2004 COMPLETED Review Details
05/07/2004 FINAL PLAT PACKAGE 05/25/2004 COMPLETED Review Details
09/18/2003 TENTATIVE PLAT REVIEW 10/22/2003 COMPLETED Review Details
11/14/2003 RESUBMITTAL - TENTATIVE PLAT REVIEW 12/01/2003 COMPLETED Review Details