Plan: S03-025
Plan Details
Apply Date:
09/10/2003
Applicant:
N/A
Description:
OFFICES AT RILLITO CROSSING
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/19/2004 | COT - WATR - Design Plan Construction | Passed | {Activity date: 11/19/2004; Status: Approved; Inspector: LHERNAND; Comment: Entered by JFEMLIN1 - PLAN NO.: 2-031-044-2004 approved} | |
11/19/2004 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 11/19/2004; Status: Approved; Inspector: TSTOCKETT; Comment: Entered by KMEDINA1 - } | |
10/30/2009 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 10/30/2009; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT2 - CHECKED THE SITE TO SEE THAT THE BICYCLE RACKS HAD BEN INSTALLED PER THE REVISED PLAN.} ; {Activity date: 04/25/2005; Status: Denied; Inspector: DROBERTS; Comment: Entered by JFEMLIN1 - not ready for any release} ; {Activity date: 08/04/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by JFEMLIN1 - BLDGS 3,4,5 are only sites ready for full release at this time, all other areas under construction} ; {Activity date: 02/28/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED AND THE FOLLOWING ITEMS HAVE BEEN FOUND TO BE COMPLETE: UTILITIES, ASPHALT, CURB, AND SIDEWALK FOR BUILDINGS #4 & #5. ALL OTHER AREAS WILL REQUIRE A REINSPECTION PRIOR TO ADDITIONAL RELEASES, OR THE PLACEMENT OF A COMPLETION BOND FOR ALL REMAINING ITEMS.} ; {Activity date: 02/21/2006; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THERE IS NOT ENOUGH SITE WORK COMPLETE ON THIS SITE TO AUTHORIZE THE INITIAL RELEASE FOR THIS SITE AT THIS TIME. ADDITIONAL WORK IS SCHEDULED TO BE COMPLETED BY 2/28/2006, THIS WILL BE CHECKED AND A RELEASE WILL BE DONE AT THAT TIME. } |
|
11/13/2009 | SPECIAL INSPECTION - OTHER (Third Party) | Passed | {Activity date: 11/13/2009; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT2 - PRIVATE SEWER, SPOKE WITH YVONNE SUAREZ FROM PIMA COUNTY WASTE WATER, SHE ADVISED THAT THERE WOULD NOT BE A LETTER FOR THIS SITE SINCE THE SEWER STUBOUT WAS DONE PRIOR TO THE SITE CONSTRUCTION.} |
Plan Reviews
Plan Number - S03-025
Plan Status: Approved
Plan Description: OFFICES AT RILLITO CROSSING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/18/2005 | FINAL PLAT PACKAGE | 02/02/2005 | COMPLETED |
02/20/2004 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 03/10/2004 | COMPLETED |
04/09/2004 | FINAL PLAT REVIEW | 05/11/2004 | COMPLETED |
07/16/2007 | REVISION - TENTATIVE PLAT REVIEW | 07/31/2007 | COMPLETED |
09/10/2003 | TENTATIVE PLAT REVIEW | 10/15/2003 | COMPLETED |
11/08/2007 | REVISION - TENTATIVE PLAT REVIEW | 11/26/2007 | COMPLETED |
11/15/2004 | RESUBMITTAL - FINAL PLAT REVIEW | 11/29/2004 | COMPLETED |
11/15/2004 | ASSURANCES | 11/19/2004 | COMPLETED |
12/03/2003 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 12/17/2003 | COMPLETED |
12/08/2004 | RESUBMITTAL - FINAL PLAT REVIEW | 12/20/2004 | COMPLETED |
12/08/2004 | ASSURANCES | 01/07/2005 | COMPLETED |